This agenda item is an on-site meeting to discuss the engineering report and safety inspection for the River Point Bridge. The location of the meeting is at the bridge, which is beside the Hannaford Shopping Center parking lot on Gray Road. In 2010, the Council advised Town Staff to aquire preliminary engineering and construction costs associated with removing and replacing the bridge in order to evaluate the Town's options. Attached are the following: engineering cost estimates for removal and replacement of the bridge; and a safety
inspection report, both prepared by Becker Structural Engineers. |