TAUNTON PLANNING BOARD
AGENDA
October 1, 2015 at 5:30 PM
(at 141 Oak St. - Maxham School)
OLD BUSINESS
Accept Minutes of September 3, 2015
NEW BUSINESS:
Site Plan Review – 265 Bay St – to allow auto sales in conjunction with the existing auto repair facility –Leonard’s Auto Repair -
Site Plan Review - Silver City Galleria Mall to allow Parker Driving School and other miscellaneous events on “PARCEL A” , submitted by Kenneth Darling, Operations Manager.
Site Plan Review - 310 Broadway for automobile display for the adjacent automobile business at 288 Broadway, submitted by NDS Realty LLC, owner Cumberland Farms Inc.
E-5 Winthrop Heights II – Release of Last lot - holding $124,000 plus $78,000 mylar deposit – Completion of Subdivision
OLD BUSINESS
APPROVED FORM A PLANS (informational purposes only)
Name Address # of Lots Date approved
Richard Feodoroff 54 Longmeadow Rd. 2 9-3-15
Surrounding Town Public Hearing Notices
Middleboro P.B. – 9-8-15 – 151 Campanelli Dr. – Mod. Of SP to allow the decrease in number of parking spaces from 260 to 246.
Norton ZBA – 9-14-15 - 270 Tremont St. – Denise Cortese – variance for the demo of existing house for new house.
Rehoboth P.B. – Site Plan – 9-16-15 – 40 x 40 commercial bldg.with 2’ x 4’ sign & future fencing – Dynasty Electric LLC
Norton ZBA – 9-14-15 – Willowcrest Estates LLC – change, extension or alteration of an existing non-conforming structure. – 27 Smith St.
Dighton ZBA- 9-16-15- US Solar Works/Peter Fine – 1820 Pine Hill Rd – Variance to allow a small scale ground mounted photovoltaic array that encroaches on the min 15 foot side setback. & SP from Sec. 4600, 5300 & 5600 Ground mounted solar photovoltaic installations.
Dighton ZBA – 9-16-15 – 124 Fatima Realty Trust – 0 ElmSt., Map 24-Lot 18-2 – variance to divide one parcel into 4 parcels with one lot having 136.68 ‘ frontage (instead of 250’)
Dighton ZBA – 9-16-15 – Julie Pelrin & Neil MacDonald – 2530 Maple Swamp Rd. – Variance of bldg.. inspector’s decision to waive required frontage to create 2 buildable lots with one lot already having an existing dwelling.
Dighton ZBA – 9-16-15 – 1458 Somerset Ave – Map 13- Lot 12 – variance to permit access through frontage created by an easement, granted in perpetuity.
Lakeville ZBA – 9-17-15 – William & Susan Furtado – SP to raze an existing dwelling along with one accessory structure & construct new single family dwelling on an non-conforming lot. At 39 Shore Avenue
Lakeville ZBA – 9-17-15 –2 Somerset Lane & Long Point Rd - 15’ x 24’ sign
Lakeville ZBA- 9-17-15 – Malloch Construction Co – SP to allow the construction of a dwelling on property where the first 400 feet is zoned business & remainder of the lot is residential. M014-B004-L0021 formerly part of 138R county St.
Lakeville ZBA 9-17-15 – SP to allow signs larger in height, higher than specified and greater number of sign. – at 7 Main St.
Norton P.B. – 9-29-15 – Norton Solar LLC – A Remand public hearing – Wheaton College & Norton P.B. Middleboro P.B. 9-29-15 – amendment to Zoning By-Laws.
Raynham P.B. – 10-1-15 – Amendment to P.B. Rules & Regs. –Project Review Fees, Definitive Plan application, Procedures, Layout plan & Profile – Street Accept. Process, Waiver of Frontage – add Deciduous & evergreen tree planning detail.
Lakeville ZBA –Notice of Decision – Cody family Irrev. Tr., - 225 Henlock Shore Rd.,No. – Granted a SP to allow the construction of addition with 3 car garage & mudroom on non-conforming lot.
Middleboro P.B. – 9-29-15 – Def. Sub – Great Quittacas Estates – off MaionRd. – 24lots – submitted by Marion Road LLC . for property at Miller St.,
Norton P.B. – 9-29-15 – Edward Sanderson, SP to allow the construction of an infiltration basins in R80 and Industrial zoning district. – located on Map 24, parcels 4,6, 63 & 8& Map 29, parcel 60 .
|