TAUNTON PLANNING BOARD
AGENDA
JUNE 5, 2014 at 5:30 PM
(at 141 Oak St. Maxham School)
NEW BUSINESS
Accept Minutes of May 1, 2014
Public Hearing- Form J Plan – 37 Warren St – waiver of frontage – to divide one lot into 2 lots – submitted by Kenneth Raymo
Cont’d. Public Meeting- Site Plan Review - 81 Ingell Street- for 615 square feet of office area and 17,198 sq. ft. of industrial area (includes updated enclosed railroad offloading dock ,a larger freezer warehouse storage area) and 27 additional parking spaces, submitted by Robert Weeks, North East Refrigerated Terminal Inc. (NERT).
Cont’d. Public Meeting - A ROADWAY IMPROVEMENT PLAN – TRIMOUNT AVENUE – land located on the west side of Trimount Avenue, Taunton, Ma.. Proposal is to improve the roadway 498 feet to create frontage for one residential lot. Modified proposal is an 8 inch gravel base and 4 inches of recycled asphalt surface. Requesting waiver of fees.
Public Meeting -Site Plan Review – 700 Joseph Warner Blvd., - expansion of an existing parking lot from 56 spaces to 78 spaces, submitted by Saint-Gobain Performance Plastics.
Public Meeting - Site Plan Review - 200 John Hancock Road - for the construction of an enclosed with a partially open walkway shelter approximately 1,200 square feet submitted by IQE KC, LLC.
Preliminary Subdivision – “Myles Standish Industrial Park – Phase V – Dever Drive – to create 11 Industrial lots – submitted by Taunton Development/Mass.Dev.
Meadow Lane Estates – Landscaping plan for approval.
Conway Estates – Requesting to eliminate sidewalks – Major or minor change
OLD BUSINESS:
Cont’d. 34 ½ Briggs Street – update
Prospect Hill Preserve – E-5 – Release of last lot – holding $20,000
APPROVED FORM A PLANS (informational purposes only)
Name Address # of Lots Date approved
ilver City Baptist Church 25 Range Ave. 2 5-22-14
Felisbela Lopes 249 Highland St 2 5-22-14
Surrounding Town Public Hearing Notices
Dighton ZBA – 5-13-14 – PMJD Realty LLC - 1422 Pine St – ‘The Pines” mod. To comp. permit –
Rehoboth P.B. – 5-7-14 – Palmer River Dev. Co., LLC - roadway for 4 lots – 231 Perryville Rd.
Rehoboth P.B. - 5-21-14 – Everado Gutierrez 7 Salvador Lara – Site Plan approval – interior/exterior bldg.. renovations and parking area improvements – Compadres Restaurant – 569 Winthrop St.
Rehoboth P.B. – 5-21-14 – Community Covenant Church – Site Plan Approval – construction of a 6,090 sq.ft.bldg., enclosed walkway, parking areas, driveway and drainage structures – 615 Tremont St.
Rehoboth P.B. – 5-13-14 – Town of Rehoboth By-Laws.
Middleboro P.B. – 5-20-13 – Amend P.B. Zoning Map.
Berkley ZBA – 5-20-14 – Paul & Debra Delpapa & Paul & Kristin Mardirosian – 53 porter St., - & 1 Parsons Walk – variance for frontage lot 1A – lot 1B lot width & frontage.
Dighton ZBA – 5-21-14 – Matthew & Mandee O’Donnell – detached garage within an accessory apartment converting a single fam. Into a two –family . 150 Center St.
Dighton ZBA – Aspen Prop LLC – 481 Main St – var. to an existing lot to create 2 lots without the req’d. frontage.
Berkley P.B. – 5-22-14 – Amend Article 21 – Sec.10 – relating to sign height, and revise Article 26, Sec. 2, and Sept. 4 to update the zoning bylaw to reflect the new FEMA flood maps.
Easton ZBA – 6-3-14 – Peter Galeno – 83 Eastman St. – variance for a 21 ‘ side setback (instead of 25’) and allow a portion of the existing and proposed structure to be used an indoor sports arena and indoor snack bar, serving food & beverages to be consumed within the bldg..
Easton ZBA – 6-3-14 – Dorothy Wyman – 7 Quail lane – relief from rear setback to construct a new mud entry and an improved master bedroom above.
Raynham P.B. – 6-4-14 – 442 New State Highway - Colbea Enterprises – convenience store gas station encroaching five feet into the 20 foot rear setback. & construction of pump island canopy within 45 feet frontsetback & 20 foot side setback & var. for signs.
Norton ZBA – 6-9-14 – Fairland Farm LLC – 364 Hickory Rd., - to extend or alter a non-conforming structure.
|