VILLAGE OF TARRYTOWN
ARCHITECTURAL REVIEW BOARD – REGULAR MEETING
WEDNESDAY, MAY 20, 2009
VILLAGE HALL – 8:00 P.M.
NEW:
- 24 Miller Avenue ARB approval of a 2 ft. high natural wall and four 3 ft. high
(Vacacela Residence) pillars in the front of the house.
- 91 North Broadway ARB approval to replace existing sign in the Broadway Sign
(Coffey Property) District.
- 167 Benedict Avenue ARB approval to replace existing sign.
(Grant Residence)
- 155 White Plains Road ARB approval for new window signage.
(Urgent Care of Westchester)
- 14 North Washington Street ARB approval for replacement of existing siding.
(Crooker Residence)
- 54 South Washington Street ARB approval to change wooden steps to stone steps.
(Quinn Residence)
- 100 Marymount Avenue ARB approval to replace existing sign on security booth.
(EF Schools)
- 100 Marymount Avenue ARB approval for the change in windows to larger egress
(EF Schools) windows for new dorm rooms in Gerard Hall.
- 153 Crest Drive ARB approval to remove existing screen porch and replace
(Madden Residence) with a pre-fabricated sunroom.
- 128 Highland Avenue ARB approval for the installation of a 6 foot high privacy
(Malik Residence) fence on the side and rear of the property.
- 122 Highland Avenue ARB approval for the installation of a 6 foot high privacy
(Batin Residence) fence on the side and rear of the property.
- 293 Crest Drive ARB approval for a first floor addition.
(Descmarchelier – Contract
Vendee)
- 40 Prospect Avenue ARB approval for window replacement in school building.
(Church of the Transfiguration
School)
- 13-15 Neperan Road ARB approval for new awning.
(Grammatas Property)
- 119 Cobb Lane ARB approval for a one-story addition.
(Blumin Residence)
|