Skip Navigation
This table is used for column layout.
 
Architectural Review Board Agenda 01/21/2009
VILLAGE OF TARRYTOWN
ARCHITECTURAL REVIEW BOARD – REGULAR MEETING
WEDNESDAY, JANUARY 21, 2009
VILLAGE HALL – 8:00 P.M.


Continued:      

  • 455 South Broadway              ARB approval to install one 27” x 20’ x 6’ wall sign and 6’ x 6’
(Doubletree Hotel)                      logo on the front façade.

  • 129 West Main Street            ARB approval for the installation of street lighting within the
(Hudson Harbor)                 complex.

  • 100 Marymount Avenue            ARB approval to replace four (4) existing signs.
(EF International School)

New:

  • 84 Rosehill Avenue              ARB approval for the installation of a four foot high picket
(Lauro Residence)                       fence.

  • 181 South Broadway              ARB approval to install a new free standing sign in the
(Hughes Law Offices)            Broadway Sign District

  • 2 Deertrack Lane                        ARB approval for installation of drainage structure along
(Davey Residence)                       northerly property line.

  • 42 North Broadway               ARB approval to install new free standing sign.
(The Reformed Church of
the Tarrytowns)

  • 29 South Depot Plaza            ARB approval for the installation of an awning sign over
(On Track Sport Center)         entry door.