Skip Navigation
This table is used for column layout.
 
Architectural Review Board Agenda 03/19/2008

VILLAGE OF TARRYTOWN
ARCHITECTURAL REVIEW BOARD – REGULAR MEETING
WEDNESDAY, MARCH 19, 2008
VILLAGE HALL – 8:00 P.M.

Continued:

1.      117 No. Washington St.          ARB approval for repairs and renovations to an existing
(Fixell/Hudson Residence)               concrete block wall and brick facing of the wall.

2.      69 Church Street                        ARB approval to replace the existing fence with a 6 foot high
(Grant Residence)                       wood privacy fence in the rear and east side of the property
                                        and a 4 foot high fence with gate in the front portion of the
                                        property.

New:

3.      23 Dixon Street         ARB approval to replace siding on the top front section of the
(Mosca Residence)                       house.  (Pending removal of parking in front of residence)

4.      35 North Broadway                       ARB approval of an illuminated wall sign in the Broadway
(Kaufman Tarrytown Co. LLC      Sign District.
for Tarrytown Stationary)

5.      39 North Broadway                       ARB approval of an illuminated wall sign in the Broadway
(Kaufman Tarrytown Co. LLC      Sign District.
for The Village Crimper)

6.      39 North Broadway                       ARB approval for a replacement awning with painted
(Coco Management for            lettering in the Broadway Sign District.
A&E Stores/Pay Half)

7.      90 Highland Avenue              ARB approval for new windows, roof, siding and a new
(Hanes Residence)                       entrance roofed porch.

8.      4 South Washington Street               ARB approval to repaint the building with a change in color.
(Gasperini Residence)

9.      67 Sheldon Avenue                       ARB approval for replacement of front porch, steps, railings
(White Residence)                       and hardwood columns.

10.     35 Fairview Avenue                      Amend ARB approval for change in siding material at the
(Merheb Residence)              face and under the front porch, change chimney from cedar
                                        shingle to stone, eliminate one window in front and side
                                        elevations and change the garage door from 16’ door to two
                                        8’ doors.

11.     19 Barnes Road                  ARB approval for a shed on the right side of property,
(Vercesi Residence)             privacy fence along a portion of the rear yard, replacement
                                        of garage door and removal of second garage door and
                                        replacement with an entry door.
Page 2
ARB Agenda – March 19, 2008

12.     2 Emerald Woods                 Amend ARB approval for change from brick to cut stone
(Gracemere Estates, LLC)                on chimney and apron of front porch.

13.     39 Storm Street                 ARB approval to replace existing masonry/concrete wall
(Sampaio Residence)             and steps with new stone finish at front entrance.