Skip Navigation
This table is used for column layout.
 
Architectural Review Board Agenda 01/17/2006


VILLAGE OF TARRYTOWN
ARCHITECTURAL REVIEW BOARD – REGULAR MEETING
WEDNESDAY, JANUARY 17, 2006
VILLAGE HALL – 8:00 P.M.



CONTINUATION

                
               1.      28 South Depot Plaza            ARB approval and sign variance for a metal
                        (All in the Family Moving &             wall sign.
                        Storage)
        
NEW

                2.      64 North Broadway                       ARB “Certificate of Appropriateness” and sign
                        (Chase Bank)                    variance for multiple signs in the Broadway
                                                                Sign District. (251-7C(3), (4) and (7).

                3.      5 Main Street                           ARB “Certificate of Appropriateness” for a
                        (Santa Fe Restaurant)           replacement wall sign in the Main Street
                                                                Historic District.

                4.      13 Kaldenberg Place             ARB approval of a two sided perpendicular
                        (Eyebuzz Design)                        sign.

                5.      123 North Washington Street     ARB approval for installation of new vinyl
                        (Falasca Residence)             siding and replacement windows throughout
                                                                the entire house.

                6.      80 Sunnyside Avenue             ARB approval to remove one window and fill
                        (Gottschall Residence)          in with exterior siding and removal of a portion
                                                                of a second window and fill in with exterior
                                                                siding.

                7.      91 Deertrack Lane                       Amend ARB approval for roof line and front
                        (Cortese Construction)          elevation.

PRELIMINARY

                7.      723 South Broadway              Preliminary review of design development for
                        (HSA-UWC)                               construction of a new building for Church
                                                                Sanctuary, Sunday school classrooms and
                                                                Church offices.