Main Street Bridge Update (w/ photos)
Attachments:
Attachment NameAttachment SizeAttachment Date
Size: 3M
Last Updated: 2017/10/18
Size: 3.1M
Last Updated: 2017/10/18
Size: 3.4M
Last Updated: 2017/10/18
Update:

New England Infrastructure has poured the footings (please see the attached photos) and Briggs Engineering was on site testing the concrete.

NEI will begin to install the concrete forms for retaining Wall #1

Thank you!