Main Street Bridge Update (w/ photos)
Attachments:
Attachment Name
Attachment Size
Attachment Date
EG 101817 02.jpg
Size: 3M
Last Updated: 2017/10/18
EG 101817 01.jpg
Size: 3.1M
Last Updated: 2017/10/18
EG 101817 03.jpg
Size: 3.4M
Last Updated: 2017/10/18
Update:
New England Infrastructure has poured the footings (please see the attached photos) and Briggs Engineering was on site testing the concrete.
NEI will begin to install the concrete forms for retaining Wall #1
Thank you!