Facilities Steering Committee Phase II Agenda 12/3/2018

DATE: December 3rd, 2018
LOCATION: Princeton Town Hall Annex-large room
REQUESTED BY: Richard Chase, Chair
______________________________________________________________________
“The listings of matters are those reasonably anticipated by the Chair 48 hours before said meeting, which may be discussed at the meeting.~ Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.”

LIST OF TOPICS TO BE DISCUSSED
  • Review and approval on minutes of 11/26
  • Morton Buildings representative Keith Halloway
  • RM additional information on Wilton NY Fire Station
  • Review information on Townsend fire station #3
  • Review and approve next round of citizen question and answers, #5, 6, 7
  • Opportunity for public questions and input.
Action items:
  • RM & NC, to compile lists of questions and answers. To be reviewed at regular meetings and then posted, ongoing
  • RC to contact package building vendors for insight on MA bidding laws for design/build and State Bond Bill.
  • RC to contact Townsend, MA with the below questions.
  • JB to collect info on Brookline NH stations and lessons learned
  • TO, please collect information on the process and requirements to secure State Bond Bill funds.
  • NN, RC how to pursue a add on for the JWA contract for cost analysis of the refined minimum building and options.
  • MP & JB, how much is the gym utilized by members of the Public Safety Department?
.
Additional discussion points:
  • What, specifically, are you looking for from Townsend regarding station 3 ?
  • Plans (Electronic version would be helpful)
  • Cost with detail at medium level
  • When constructed?
  • How has the building met Town’s needs now and the foreseeable future?
  • Experience with building, issues and how will it handle growth?
  • Lessons learned
  • UPCOMING MEETINGS~~MEETING/EVENT~~~EST. TIME~~~~~~~LOCATION
  • Dec 10th                        Regular Meeting~        7:00 PM~        Annex (Large Rm)
  • Dec 17th                        Regular Meeting~        7:00 PM~        Annex (Large Rm)
  • Jan 7th, 2019                   Regular Meeting~        7:00 PM~        Annex (Large Rm)
Abbreviations:

RC      Richard Chase
NC      Noelani Chase
RM      Rick McCowan
NN      Nina Nazarian
MP      Michele Powers
JB      John Bennett
TK      Tim Kelly
KC      Karen Cruise
TO      Takako Oji
        EC      Ed Cichon
Other background information:
  • Revised Charge (Approved at 10/22/18 FSC2 meeting and submitted to Selectboard)
  • Develop, with the assistance of an architect, a refined version of the current proposals for a Public Safety Complex. This will include reviewing existing and new requirements and construction methods with the intent to meet the long term needs of the Public Safety Department while exploring ways to reduce the costs significantly. ~The refined proposals should include the choice of building all new or renovating and including a portion of the original building.~ The refined proposals should comply with appropriate public safety and building standards and include conceptual drawings and cost estimates.
  • Develop and execute a communication plan, using the information developed above, to inform voters for a town meeting to secure funding for the development of final plans & construction documents for a new public safety complex to be built at the Princeton center school site.~ The vote may include the choice of building all new or renovating and including a portion of the original building.~
  • Work jointly with the Select Board and the Town Administrator to obtain funding via the Bond Bill for the Public Safety complex.
  • Draft plan to meet revised charge;
  • Talk with JWA to better understand the conceptual proposals and the NFPA and Police standards and other information which drive the conceptual proposals and costs.
  • Review JWA proposals A & B using the above standards and information.
  • Refine options to limited number, All new “required minimum building”, Fire and EMS only, Fire, EMS & Police.
  • Option 2 additional construction requirements & costs for incorporating orig façade
  • Option 3 additional construction requirements & costs for incorporating original classrooms of PC bld.
  • From review, develop the above conceptual designs with input from citizens, format tbd.
  • Work with Selectboard to secure small amount of funding ($10-25K) for the professional review, elevations, floor plans and cost modeling.
  • Prepare for Town Meeting/ Vote to select option and approve funding for construction documents for the selected design only. Not for building construction.
  • Pursue state bond bill money once full construction documents are completed.

Key points from previous meetings:
  • JWA did a detailed analysis of needs and NFPA and Police standards which drive much of the building size and configuration. FSCp2 needs this level of detail so that we can complete the review.
  • Bill Holder, to maintain Town debt to less than 7% of Town Budget would constrain total borrowing to $4M-6M over the next 3 years for all purposes including a public safety complex.