Planning Board Minutes 08/19/2008 ~ Site Walk
Town of Otisfield
Planning Board
        Public Site Walk
August 19, 2008

Applicant Name: Ian & Maureen Johnson
                        Represented by Ken Bartow, Bartow Construction, Inc  
                        Tax map: U2, Lot 17

Reasons for this site walk:     

Issue regarding:        
~ Reconstruction of a building within 100’ of the shoreline
~ 30% Expansion Determination
~ Greatest Practical Extent Determination

Falls under the responsibility of the Otisfield Planning Board
Addressed under Otisfield’s Shoreland Zoning Ordinance
Section 12 (NON-CONFORMANCE),
Letter C (Non-Conforming Structures)
Number 1 (Expansions)
Number 3 (Reconstruction or Replacement)

1.      Call to order: The Site Walk was called to order at 6:00 PM.

2.      Attendance:
PB Members present:
Chairman - Stan Brett
Vice Chair - Dan Peaco
Mike McAllister  - Recording Secretary
Herb Olsen
Beth Damon
        Karen Turino, Alternate
       Dave McVety, Alternate

Planning Board Secretary:  Tanya Taft
Code Enforcement Officer:  Richard St. John

3.      Introduction of Otisfield Board of Selectmen present at this meeting.

Hal Ferguson – Chair, & Rick Micklon   * Mark Cyr not in attendance
4.      Introduction of the applicants: Ian & Maureen Johnson
Represented by Ken Bartow, Bartow Construction, Inc.
Limited Residential District of the Shoreland Zone along Thompson Lake.

5.      Introduction of any consultants attending on behalf of the Planning Board.
(Not in attendance at this time per the recommendation of the Board)

6.      Public Attendance:              Address                                 Abutter 
        Curt Bailey                     Otisfield                                       No
        Andry Simon             Otisfield                                       Yes
        Gerald Morris           Otisfield                                       No
        Ian & Maureen Johnson   Otisfield                                       Applicant
        Ken Bartow

Hal Ferguson, BOS               Otisfield
        Rick Micklon, BOS               Otisfield                                       
                
7.      Discussion & Comments:

Site-Walk was opened by SB. PB observed & discussed erosion issues that may occur.  Erosion control plan is in place. Greatest Practical Extent was discussed and from viewing the site all agreed that structure must stay at current location. MDEP is aware of this project and their input is the structure should NOT go any closer to the Lake. Demolishing structure will take approx. 6 weeks. Route 121 traffic may need to go down to one lane traffic. Ken plans to eliminate driveway. Old structure is inside MDOT ROW by about 2.5’, new structure will be about 2 feet from the MDOT line. Structure may end up w/ a crawl space, rocks will dictate what end result will be. MDOT, ROW stakes were identified. This will be a Seasonal Structure w/ a seasonal septic system. First floor of house will be 7” higher. Structure will be less non-conforming from both sides and rear than existing structure. An independent remote retaining wall may be implemented. Revegetation Plan not designed at this time, but will be with the approval of the CEO. Stone drip edges will be used for storm-water runoff. Overhead wires prevent construction from taking place on the Rt. 121 side. Testing was done to make sure Rt. 121 won’t be compromised. No further discussions.


8.      Adjournment:  6:50 PM



Respectfully submitted,
Tanya Taft, Secretary.
Approved by:
Stan Brett, Chair
Otisfield Planning Board~
Approved on: 09/02/08