Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2014/08/12
Orleans Conservation Commission                                 

Work Meeting    Nauset Room             August 12, 2014

8:30 a.m.       Call to Order   

Continuations
Last Heard 8/5/14 (JO1)
Richard Cryer                                           52 Willie Atwood Road
by Ryder & Wilcox, Inc.  Assessor’s Map 23, Parcels 31 & 32.  The proposed abandonment of the current septic system & installation of a new septic system.  Work will occur within 100’ of the Edge of a Wetland.  

Revised Plan
Thomas & Diane Burnham                                  70 Captain Linnell Road
The proposed construction of a single-family dwelling; installation of a septic system & utilities; & grading & landscaping has been revised to rotate the approved building clockwise, moving the proposed deck further from the resource area.  Work will occur within 100’ of the Edge of Wetland.  

Certificate of Compliance
Michael & Patricia Schumaecker (2013)                   161 Monument Road
The request for a Certificate of Compliance for an Order of Conditions for the expansion of an existing deck.  

William Gaughan (2013)                                  40 Winslow Drive
The request for a Certificate of Compliance for an Order of Conditions for the upgrading of an existing septic system including the pumping & abandonment of the existing system.

Alphonse & Debra Calvanese (2000)                       10 Alewife Way
The request for a Certificate of Compliance for an Order of Conditions for the demolition of an existing garage & construction of a new detached garage.  

Administrative Reviews
Rachelle Bernacki                                               71 Uncle Israel Road
The proposed installation of a 12x16’ shed.  Work to be done by Pine Harbor.    

Chris Sammartino                                                17 Old Farm Road
The proposed removal of 2 Black Locust trees and 3 Sycamore maples.  Work to be done by Rob Morrison.

Kathleen Patten                                         17 High Tide Lane
The proposed removal of a cedar tree.  Work to be done by Bruce White of Bravo Tree Company.  

Andrew & Monica Cattano                                 33 Harvey’s Lane
The proposed removal of up to 12 tree of heaven, 1 sycamore maple, and pruning of deadwood on cedar trees.  The planting of 3 Arrowood Viburnums and 1 shade tree. Work to be done by applicant.

Ronald Corrigan                                         48 Bridge Road
The proposed removal of an existing shed and replacement with a new 10’x12’ shed.  Work to be done by Minot Reynolds (removal) and applicant.

Joshua Rosenbloom                                       28 Viking Road
The proposed removal of three pines, 2 down trees, trimming of holly, and the raising of the canopy of an existing spruce.  Work to be done by A to Z Treez.   

Peter Matheson                                          4 Seal Lane
The proposed removal of a pitch pine tree leaning over the road.  Work to be done by Nauset Landscapes.

Dwight Wilson                                           14 Tides End Lane
The proposed removal of a cherry tree.  Work to be done by A to Z Treez.  

Other Member’s Business

Administrator’s Business

Site Visits
Division of Marine Fisheries (DMF)                      Herring Brook Way
by the Town of Orleans, Assessor’s Map 55, Parcels 36 and 53.  The proposed repairs to the lower end of the herring run, including stabilization of walls, rehabilitation of fish passage weirs, & minor repairs to the upper weir structure near Pilgrim Lake.  Work will occur in a Fish Run, in a Wetland, in Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.