Orleans Conservation Commission (revised)
Work Meeting Nauset Room January 14, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 12/17/13 (JO1)
Elizabeth Ann Sanders Irrevocable Trust of
April 9, 1999, & Charles A. Sanders 3 South Little Bay Road
by East Cape Engineering, Inc. Assessor’s Map 82, Parcel 6. The proposed stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & the Pleasant Bay A.C.E.C.
Last Heard 1/7/14
Samuel J. & Nancy H. Scialabba 32 Harbor View Lane
by Ryder & Wilcox, Inc. Assessor’s Map 29, Parcel 11. The after the fact cutting of trees on a Coastal Bank. Work occurred on a Coastal Bank & within 100’ of the Edge of a Salt Marsh.
Last Heard 1/7/14
Thomas & Jennifer Woodward 2 Sandbar Lane
By Ryder & Wilcox, Inc. Assessor’s Map 17, Parcel 14. The proposed renovations & additions to an existing single family dwelling; the pumping & abandonment of an existing septic system; & installation of a new septic system. Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.
Last Heard 1/7/14
Timothy J. Brady & Heidi J. Schmidt 27 South Orleans Road
By East Cape Engineering, Inc. Assessor’s Map 26, Parcel 69. The proposed demolition of an existing fire damaged house & construction of a new house on the existing foundation. Work will occur within 100’ of the Top of a Coastal Bank.
Certificate of Compliance
Administrative Reviews
Other Business
Orleans Conservation Trust Trail Guide CPA Application
Request a vote of support of the Conservation Commission for the pending Trail Guide Community Preservation Application submitted by the OCT.
Administrator’s Business
Site Visits
Kent Zelle 57 Nauset Heights Road
by J.C Ellis Design Co Inc., Assessor’s Map 22, Parcel 54. The proposed pumping and abandoning of an existing septic and cesspools and the installation of a new septic system to serve an existing dwelling and an existing cottage. Work will occur within 100’ of an Isolated Vegetated Wetland.
Marshgate Limited 34 & 40 Carlton Road
by Ryder & Wilcox, Inc. Assessor’s Map 82, Parcel 1. The proposed pumping & abandonment of existing cesspools & leaching pits; the installation of a new septic system for main house & cottage; installation of new municipal water lines; & interior renovations to the existing main dwelling. Work will occur within the Buffer Zone to the Top of a Coastal Bank & in the Pleasant Bay A.C.E.C.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|