Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2014/01/07
Orleans Conservation Commission                                 

Hearing Meeting Nauset Room                     January 7, 2014
8:30 a.m.       Call to Order   

Continuations
Last Heard 11/5/13
Samuel J. & Nancy H. Scialabba                          32 Harbor View Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 29, Parcel 11.  The after the fact cutting of trees on a Coastal Bank.  Work occurred on a Coastal Bank & within 100’ of the Edge of a Salt Marsh.  

Last Heard 11/19/13 (SP1, RN1, KG1)
Daniel & Andrea Schmieg                                 13 Kingsbury Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 71, Parcel 1.  The proposed reconstruction of an existing boathouse; stabilization of an eroding bank; replacement of failing fiber rolls with gabion/fiber roll toe protection; removal of invasive plant species, & plant with native species.  Work will occur on a Coastal Bank, on a Coastal Beach, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.

Last Heard 12/17/13 (JO1)
Gregory M & Patricia McGauley                           1 Sandbar Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 56, Parcel 14.  The proposed replacement of dug-in timber steps with new dug-in timber steps & an elevated stairway on a Coastal Bank.  Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.

Last Heard 12/17/13 (JO1)
Karen & Marilyn Watson-Etsell                           156 Rock Harbor Road
by JC Ellis Design Co, Inc.  Assessor’s Map 17, Parcel 51.  The proposed upgrade of an existing septic system.  Work will occur within 100’ of a Bordering Vegetated Wetland, Salt Marsh & within Land Subject to Coastal Storm Flowage & the Inner Cape Cod Bay A.C.E.C.  

Notice of Intent
Thomas & Jennifer Woodward                              2 Sandbar Lane
By Ryder & Wilcox, Inc.  Assessor’s Map 17, Parcel 14.  The proposed renovations & additions to an existing single family dwelling; the pumping & abandonment of an existing septic system; & installation of a new septic system.  Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.

Timothy J. Brady & Heidi J. Schmidt                     27 South Orleans Road
By East Cape Engineering, Inc.  Assessor’s Map 26, Parcel 69.  The proposed demolition of an existing fire damaged house & construction of a new house on the existing foundation.  Work will occur within 100’ of the Top of a Coastal Bank.

Certificate of Compliance
Bill Choquette (2013)                                   221 Rock Harbor Road
The request for a Certificate of Compliance for an Order of Conditions for the pumping & abandonment/removal of existing cesspools, & the installation of a new septic system to serve an existing single-family dwelling.

Richard E. Dupont (2010)                                        18 Sages Way
The request for a Certificate of Compliance for an Order of Conditions for the removal of an existing dwelling including abandonment of the septic system and construction of a new dwelling and septic system.  This request is for a full Certificate of Compliance with no On-going Conditions, to supersede the previously issued Certificate.  

Chairman’s Business
Approval of the Minutes from the Meeting on July 23, 2013 and August 6, 2013

Other Member’s Business

Meet with Town Counsel Michael Ford in Executive Session to discuss strategy with respect to litigation
Motion:~ Move to go into Executive Session to discuss strategy with respect to litigation, and that the Chair declares that an open meeting may have a detrimental effect on the litigating position of the body, and to reconvene in Open Session.
(Chair declares that an open meeting may have a detrimental effect on the litigating and/or negotiating position of the body.)

Site Visits
Thomas & Jennifer Woodward                              2 Sandbar Lane
By Ryder & Wilcox, Inc.  Assessor’s Map 17, Parcel 14.  The proposed renovations & additions to an existing single family dwelling; the pumping & abandonment of an existing septic system; & installation of a new septic system.  Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.

Timothy J. Brady & Heidi J. Schmidt                     27 South Orleans Road
By East Cape Engineering, Inc.  Assessor’s Map 26, Parcel 69.  The proposed demolition of an existing fire damaged house & construction of a new house on the existing foundation.  Work will occur within 100’ of the Top of a Coastal Bank.

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.