Orleans Conservation Commission
Hearing Meeting Nauset Room December 17, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 11/19/13 (SP1, RN1, KG1)
Daniel & Andrea Schmieg 13 Kingsbury Lane
by Ryder & Wilcox, Inc. Assessor’s Map 71, Parcel 1. The proposed reconstruction of an existing boathouse; stabilization of an eroding bank; replacement of failing fiber rolls with gabion/fiber roll toe protection; removal of invasive plant species, & plant with native species. Work will occur on a Coastal Bank, on a Coastal Beach, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Last Heard 11/12/13 (SP1, JO1)
Elizabeth Ann Sanders Irrevocable Trust of
April 9, 1999, & Charles A. Sanders 3 South Little Bay Road
by East Cape Engineering, Inc. Assessor’s Map 82, Parcel 6. The proposed stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & the Pleasant Bay A.C.E.C.
Notice of Intent
Gregory M & Patricia McGauley 1 Sandbar Lane
by Ryder & Wilcox, Inc. Assessor’s Map 56, Parcel 14. The proposed replacement of dug-in timber steps with new dug-in timber steps & an elevated stairway on a Coastal Bank. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Karen & Marilyn Watson-Etsell 156 Rock Harbor Road
by JC Ellis Design Co, Inc. Assessor’s Map 17, Parcel 51. The proposed upgrade of an existing septic system. Work will occur within 100’ of a Bordering Vegetated Wetland, Salt Marsh & within Land Subject to Coastal Storm Flowage & the Inner Cape Cod Bay A.C.E.C.
Certificate of Compliance
Lee Cable (2010) 9 Baxter Lane
The request for a Certificate of Compliance for an Order of Conditions for the upgrade of a septic system and construction of a driveway.
Pamela Peedin (2010) 40 Gibson Road
The request for a Certificate of Compliance for an Order of Conditions for the renovations to an existing single-family dwelling to include second story dormers, installation of new doors & windows, replace windows, construction of a stone retaining wall, & replacing Coastal Bank stairs.
Ken Eisner, Countryside Building & Development (2013) 8 High Street
The request for a Partial Certificate of Compliance for an Order of Conditions for the construction of a single family dwelling; installation of a septic system and utilities; construction of a driveway; culvert installation; and landscaping.
Revised Plan
George Najarian 33 Bufflehead Road
The applicant would like to request a second passing of the hydrorake to remove re-growth of the cattails within the approved work area.
Administrative Reviews
Paul Heanue 3 Herring Brook Way
The proposed removal of 2 wind thrown trees.
Chairman’s Business
Other Member’s Business
Administrator’s Business
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|