Orleans Conservation Commission
Work Meeting Nauset Room September 24, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 8/13/13
Steve Simon 8 & 10 Beach Road
Assessor’s Map 36, Parcel 23 & 24. The proposed installation of a water line. Work will occur within 25’ of the Edge of Wetland.
Last Heard 9/17/13
Ramani & Louise Ayer 22 Horseshoe Lane
by Ryder & Wilcox, Inc. Assessor’s Map 89, Parcel 8. The proposed construction of a timber stairway on a Coastal Bank; bank nourishment; supplemental planting of salt marsh grasses; revegetation; invasive plant management; & landscaping. Work will occur on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage, Land Under Water, Salt Marsh, & in the Pleasant Bay A.C.E.C.
Administrative Reviews
Linda and Fred Bozek 102 Skaket Beach Road
The proposed installation of a dormer. Work to be done by Michael Woessner.
Chairman’s Business
Approval of the Minutes from the Meeting on June 25, 2013
Other Member’s Business
Administrator’s Business
Correspondence- 4 Duck Pond Lane- Dismissal of Lawsuit.
Site Visits
Carol Nace 75 Viking Road
by East Cape Engineering, Inc. Assessor’s Map 70, Parcel 31. The proposed removal & reconstruction of an existing licensed pier & seasonal float. Work will occur on a Salt Marsh, in Land Under Water, in Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
John & Olive Murphy 25 Gull Lane
by Ryder & Wilcox, Inc. Assessor’s Map 24, Parcel 61. The proposed construction of a garage/studio addition to an existing single-family dwelling; the pumping & abandonment of an existing cesspool; & the installation of a new septic system. Work will occur within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, & Land Subject to Coastal Storm Flowage.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|