ConserveAgendas 2013/08/27
Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     August 27, 2013
8:30 a.m.       Call to Order   

Continuations
Last Heard 8/20/13
The Whole Clam LLC                                      5 Route 6A
by Baxter-Nye Engineering & Surveying.  Assessor’s Map 18, Parcel 52.  The proposed renovation of the existing restaurant, construction of a new septic system & stormwater management facility, rebuilding of a retaining wall, & landscaping.  Work will occur within 100’ of Land Subject to Flooding.  

Last Heard 8/20/13
Jonathan S. Weiss & Susan Lee Bruce                     24 Weeset Proprietors Way
by Coastal Engineering Company, Inc.  Assessor’s Map 6, Parcel 3.  The proposed repair of existing revetment.  Work will occur on a Coastal Bank, within Land Subject to Coastal Storm Flowage, within Land Subject to Flooding, & within 100’ of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, & the Nauset Estuary.

Last Heard 8/20/13 (JO1)
Stephen Brodeur                                         25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4.  The proposed reconstruction of a stone revetment, installation of stone retaining walls, removal of existing patio areas, and mitigation plantings has been Amended to extend the revetment reconstruction and restore the bank from recent storm event damage.  Work will occur on the Top of a Coastal Bank, within Land Subject to Coastal Storm Flowage, and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, and the Nauset Estuary.

Certificate of Compliance
Brick Hill Nominee Trust (2000)                         171 Brick Hill Road
The request for a Certificate of Compliance for an Order of Conditions for the demolition and removal of existing dilapidated buildings and construction of tennis court, widening of existing driveway, clearing, grading, and landscaping/revegetation.  

Joy Fopiano (2007)                                              16 Honeysuckle Lane
The request for a Certificate of Compliance for an Order of Conditions for the removal, reconstruction, and additions to an existing dwelling and the construction of a garage, shell driveway, and mitigation plantings.  

Administrative Reviews
Stanley Charm                                           17 Marsh Lane
The proposed installation of a 6’ stockade fence 88’ long, installation of native plantings, and the removal of one pine tree.  Work to be done by Dennis Dwyer.

Kathy Gordon                                            3 Skaket Circle
The proposed removal of the top of a leaning locust, removal of one locust, and trimming of overgrown privet.  Work to be done by A to Z Treez.  

Christopher Frey                                                71 Briar Springs Road
The proposed removal of a leaning cedar tree, removal of a dead choke cherry, removal of privet hedges by pool, and removal of lower right branches of a cedar tree to open view by pool.  Work to be done by applicant.  

Cindy Kawie                                                     36 Gibson Road
The abandonment of an existing sewage disposal system and the installation of a new sewage disposal system, gas line, underground utilities, and removal of cedar tree.

Cindy Kawie                                                     36 Gibson Road
The proposed replacement of the existing deck within the same footprint.  Work to be done by Stanley Gove.  

David Dunford                                           11 Portside Lane
The proposed removal of large oak branch and dead cedar tree.  Work to be done by After Hours Tree Service.  

Tom Healy                                                       36 Areys Lane
The proposed removal of invasive vegetation, removal of dead trees, removal of small shrubbery, and vista pruning as needed.  Work to be done by J.H. Daley Landscapes.  

Elizabeth & Dale Smith                                  41 Towhee Lane
The proposed removal of a dead pitch pine and replant with 4 1-gallon beach plums.  Work to be done by Namskaket Farms.  

Colleen Young                                           10 Towhee Lane
The proposed removal of 3 dead trees threatening house and the trimming of branches hanging over deck and garage.  Work to be done by Cape Organics.  

Stanley Snow                                            22 Gibson Road
The proposed removal of 3 trees, stumps to be ground.  Work to be done by The Tree Wizard.  

Other Member’s Business

Administrator’s Business

Correspondence
Complaint and appeal of the decision of the Orleans Conservation Commission
RE: 4 Duck Pond Lane.  
Site Visits     
Jeanne Hasenmiller                                              28 Beach Plum Lane
by East Cape Engineering, Inc.  Assessor’s Map 23, Parcel 7.  The proposed construction of a detached garage with associated site improvements.  Work will occur within 100’ of the Edge of Wetland.  

Edward & Natalie Bagdonas                               54 Beach Road
by Ryder & Wilcox, Inc.  Assessor’s Map 36, Parcel 45.  The proposed construction of a detached garage with artist studio above; extension of deck on existing single-family dwelling; & replacement of existing septic tank & D-box (if present).  Work will occur within 100’ of the Edge of an Inland Wetland.  

Nancy Hall                                                      33 Whites Lane
by Coastal Engineering Company, Inc.  Assessor’s Map 49, Parcel 11.  The proposed repair and relocation of an existing licensed pier.  Work will occur in a Salt Marsh, in Land Under Water, on Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.

John Munoz                                                      92 Tonset Road
by Ryder & Wilcox, Inc.  Assessor’s Map 26, Parcel 74.  The proposed upgrading of an existing septic system including the pumping & abandonment of an existing cesspool; the installation of a new septic system to serve an existing single-family dwelling; & the installation of a new water service.  Work will occur within 100’ of the Top of a Coastal Bank.    

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.