Orleans Conservation Commission
Hearing Meeting Nauset Room August 20, 2013
8:30 a.m. Call to Order
Notice of Intent
The Whole Clam LLC 5 Route 6A
by Baxter-Nye Engineering & Surveying. Assessor’s Map 18, Parcel 52. The proposed renovation of the existing restaurant, construction of a new septic system & stormwater management facility, rebuilding of a retaining wall, & landscaping. Work will occur within 100’ of Land Subject to Flooding.
Jonathan S. Weiss & Susan Lee Bruce 24 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 3. The proposed repair of existing revetment. Work will occur on a Coastal Bank, within Land Subject to Coastal Storm Flowage, within Land Subject to Flooding, & within 100’ of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, & the Nauset Estuary.
Amended Order of Conditions
Stephen Brodeur 25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4. The proposed reconstruction of a stone revetment, installation of stone retaining walls, removal of existing patio areas, and mitigation plantings has been Amended to extend the revetment reconstruction and restore the bank from recent storm event damage. Work will occur on the Top of a Coastal Bank, within Land Subject to Coastal Storm Flowage, and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Coastal Beach, Land Subject to Coastal Storm Flowage, and the Nauset Estuary.
Revised Plan
Stephen Brodeur 25 Weeset Prop Way
The proposed property redevelopment including select structural & site demolition; reconstruction and reconfiguration of the existing dwelling; installation of a new septic system; and the enlargement of buffer planting areas has been Amended to include the proposed location of 4 A.C. units, a propane tank, generator, and associated utilities. Work will occur within 100’ of the Top of a Coastal Bank and within Land Subject to Coastal Storm Flowage.
Certificate of Compliance
Thomas Miller (2003) 5 Pond Road
The request for a Certificate of Compliance for an Order of Conditions for the installation of a leaching field to serve an existing two-family duplex; existing septic tank to remain in use.
Restoration Plan
Forrester Quinn 4 Overland Way
The proposed restoration plan for operations that have encroached onto town property. Work has occurred within 100’ of the Edge of Wetland and the Cape Cod Bay A.C.E.C.
Bond Release Request
Kevin Wise (2010) 14 Surf Path
The request to release a $5,000.00 bond for the purpose of landscape up-keeping.
Administrative Reviews
Jeffrey & Karen LaVoie 6 Skymeadow Drive
The proposed removal of 9 dead oak and pine trees.
Page McMahan 13 Morgans Way
The proposed removal of 3 dead oaks and replacement with Maples.
Sarah Fisher 29 Henson’s Way
The proposed removal of dead locust and bittersweet vines. Work to be done by applicant.
Stanley Charm 17 Marsh Lane
The proposed installation of a 6’ stockade fence 112’ long and the removal of one pine tree. Work to be done by Dennis Dwyer.
Louise Ayer 22 Horseshoe Lane
The proposed removal of 3 trees, pruning, fertilizing, and mulching of native Oaks and Cherry trees. Use existing topsoil to cover exposed roots of one Cherry. Work to be done by Betsy Furtney and Bartlett Tree Experts.
Michael Tonis 29 Sparrowhawk Road
The proposed crown reduction pruning of 4-5 trees by 5-6’ for Marsh View for abutter. Work to be done by Peter Fishbein.
Chairman’s Business
Approval of the Minutes from the Meeting on June 4, 2013 and July 16, 2013
Other Member’s Business
Administrator’s Business
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|