Orleans Conservation Commission
Work Meeting Nauset Room June 11, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 6/4/13 (JO1, PM1)
Timothy & Andrea Howell 25 Cheney Road
by Ryder & Wilcox, Inc. Assessor’s Map 42, Parcel 1. The proposed removal of an existing single-family dwelling; the construction of a new single-family dwelling; the replacement of an existing timber stairway; invasive plant management; & native plant restoration. Work will occur in the buffer zone to the Top of a Coastal Bank, on a Coastal Bank, on a Coastal Beach, on Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Certificate of Compliance
Stephen Vorel (2013) 5 Little Marsh Lane
The request for a Certificate of Compliance for an Order of Conditions for the proposed installation of a Title 5 septic system to replace an existing failed system and the pumping and filling of the existing leaching pit.
Harwich Ecumenical Council for Housing (2009) 257 Route 6A
The request for a Certificate of Compliance for an Order of Conditions for the construction of 4 dwellings with associated landscaping and utilities.
Other Business
Sea Call Farm: meet with Sea Call Supporters
- Review of Draft Caretaker Agreement
- Review of Sea Call Supporters Annual Agreement
- eReview of Rise Engineering proposed upgrades to Sea Call Farm building
Appoint Conservation Commission Member to Community Preservation Committee
Administrative Reviews
David Ohnemus 19 Ruggles Road
The proposed relocation of a portion of a driveway.
Geoffrey Kanter 120 Freeman Lane
The proposed removal of a storm damaged cedar and replanting with native species.
Chairman’s Business
Approval of the Minutes from the Meeting on May 28, 2013
Site Visits
Jonathan S. & Judith A. Chester 124 Namequoit Road
by Ryder & Wilcox, Inc. Assessor’s Map 70, Parcel 11. The proposed construction of a pervious bluestone patio within existing lawn area; removal of invasive species; & restoration with native plantings. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Mark & Elizabeth Burnett 24 The Lane
by Coastal Engineering Company, Inc. Assessor’s Map 50, Parcel 116. The proposed renovation of an existing dwelling, relocation of an existing septic tank, & landscaping. Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.
Forrester & Linda Quinn 4 Overland Way
The proposed restoration plan for operations that have encroached onto town property. Work has occurred within 100’ of the Edge of Wetland and the Cape Cod Bay A.C.E.C.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|