Orleans Conservation Commission
Hearing Meeting Nauset Room May 7, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 4/16/13 (JB1, JKB1, PM1)
Ronald E. Provost 24 & 26 Pine Ridge Lane
by JC Ellis Design Company, Inc. Assessor’s Map 27, Parcel 76 & 77. The proposed septic system upgrade, abandonment of existing septic system components, & construction of an addition. Work will occur within 100’ of the Edge of an Isolated Vegetated Wetland.
Notice of Intent
Steve Simon 8 & 10 Beach Road
Assessor’s Map 36, Parcel 23 & 24. The proposed installation of a water line. Work will occur within 25’ of the Edge of Wetland.
Eric & Reva Fischman 27 Ruggles Road
by Artistic Grounds, Assessor’s Map 11, Parcel 21. The proposed landscape project to include the construction of a pool, fire pit, outdoor grill, stone walls, and re-surfacing of an existing patio using permeable pavers. Work will occur within 100’ of the Top of a Coastal Bank & Land Subject to Coastal Storm Flowage.
Enforcement Order
Kevin Doherty 4 Duck Pond Lane
The proposed issuance of an Enforcement Order for the alteration of land within 50’ of the Edge of Wetland and an Unnamed Pond.
Lisa Cohen 165 Tonset Road
The proposed issuance of an Enforcement Order for the unpermitted construction of a deck and alteration of land within 50’ of the Edge of Wetland and an Unnamed Pond.
Administrative Reviews
Jen Burton 13 Quail Hill Road
The proposed removal of 6 trees. Work to be done by Jimmy Reynolds.
Bernd Zellar 654 S. Orleans Road
The proposed repair /replacement of storm damaged stairs over the existing rock revetment. Work to be done by Harry Ellis.
Max & Anne Makowsky 5 Deep Pond Circle
The proposed construction of a deck with hand-dug sonotubes.
East Egg Homeowners & Gene Hornsby 19 & 21 Little Bay Road
The proposed bank nourishment with 30 yards of compatible beach sand and proposed covering of existing gabions with 20 yds compatible beach sand Work to be done by Anchor Marine.
Richard Thompson 24 Priscilla Road
The proposed construction of a 10x20’ shed. Work to be done by applicant.
Elliot Lewis 84 Arey’s Lane
The proposed removal of a locust tree. Work to be done by S & L Tree Services.
Chairman’s Business
Approval of the minutes from April 2, 2013, April 9, 2013, and April 23, 2013.
Other Business
Request from Town Administrator to approve the use of the Wetland Filing Fees to help offset expenses to support the work of the Conservation Office and Parks Department in the care and maintenance of properties under their jurisdiction and control.~
Administrator’s Business
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|