Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2013/04/09
Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     April 9, 2013
8:30 a.m.       Call to Order   

Continuations
Last Heard 3/19/13
Christopher Frey                                                        11 Freeman Lane
Assessor’s Map 5, Parcel 48.  The proposed replanting of the buffer zone as a result of the unpermitted removal of trees & bushes.  Work occurred and will occur within 100’ of the Edge of Wetland.  

Last Heard 4/2/13
Donald & Karen Bachman                                          2 Mayona Circle
by Ryder & Wilcox, Inc. Assessor’s Map 50, Parcel 105.  The proposed removal of an existing dwelling & construction of a single family dwelling; the pumping & abandonment of existing cesspools; the installation of a new septic system, & grading & landscaping.  Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.

Last Heard 4/2/13
Eric & Helen Dicke                                              66 Davis Road
by Land Design Associates.  Assessor’s Map 89, Parcel 18.  The proposed construction of a single family dwelling & the removal of invasive species.  Work will occur within 100’ of the Edge of an Unnamed Pond & the Edge of a Wetland.    

Last Heard 4/2/13
Steven Vorel                                                    5 Little Marsh Lane
by Ryder & Wilcox, Inc. Assessor’s Map 69, Parcel 43.  The proposed installation of a Title 5 septic system to replace an existing failed system & the pumping & filling of the existing leaching pit.  Work will occur within 100’ of the Edge of an Inland Wetland.

Revised Plan
Peter & Susan Worley                                    26 Deer Run
Order SE 54- 2069. The proposed construction of a 4-bedroom dwelling and an attached garage has been revised to include proposed changes to landscaping and stairs.  

Certificate of Compliance
Richard T. & Joy L. Kanter (2007)                       120 Freeman Lane
Order SE 54-1880. The request for a Certificate of Compliance for an Order of Conditions for the removal of a pool house and the construction of an addition to an existing dwelling.  

Administrative Reviews
Gary Brusseau                                           11 Center Place Unit H
The proposed continuation of a garden bed including the removal of 4 standing locusts; 18 maple saplings; one cherry tree; trimming of two maples; removal of underbrush; and installation of 6-12” of loam, and the opening of a view to the pond including the removal of 3 locusts; removal of downed trees; and the mowing of briars to create a view corridor.  

Thomas Joy                                                      13 Morgans Way
The proposed thinning of the understory of 3 to 4 understory oaks.  

Geoffrey Kanter                                         120 Freeman Lane
The proposed removal of a storm damaged cedar.  

Virginia Snedecor                                               19 Weston Taylor Lane
The proposed trimming of vegetation and removal of trees over deeded view.  Work to be done by Black Duck Landscape.    

Teresa Cochran                                          118 Areys Lane
The proposed removal of underbrush, invasives, and fallen locust trees.  

Orleans Conservation Trust                      11 Drummond Road & 13 Champlain Road
The proposed installation of boardwalks within existing walking trails.

Chairman’s Business
Approval of the Minutes from the Meeting on March 26, 2013

Other Member’s Business

Administrator’s Business

Site Visits
Ronald E. Provost                                               24 & 26 Pine Ridge Lane
by JC Ellis Design Company, Inc. Assessor’s Map 27, Parcel 76 & 77.  The proposed septic system upgrade, abandonment of existing septic system components, & construction of an addition.  Work will occur within 100’ of the Edge of an Isolated Vegetated Wetland.  

Steve Cahill & Ellen Farrell                                    40 Lake Drive
by Ryder & Wilcox, Inc.  Assessor’s Map 87, Page 74.  The proposed renovations & construction of additions to a single-family dwelling; the construction of a detached garage; & the upgrade of a septic system.  Work will occur within 100’ of an Inland Bank & Vegetated Inland Wetland on Lily Pond.    

David J. & Pamela L. Driscoll                           26 Horseshoe Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 89, Parcel 9.  The proposed stabilization of a coastal bank including include the removal of several trees, installation of fiber rolls & replanting of the area with native species has been amended to extend the bank stabilization 80’ to the north.  Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & within 100 feet of the Top of a Coastal Bank.

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.