Orleans Conservation Commission
Work Meeting Nauset Room September 25, 2012
8:30 a.m. Call to Order
Continuations
Last Heard 9/4/12 (AP1, JO1)
Joyce R. & Kevin C. Stone 25 Childs Homestead Road
by Ryder & Wilcox, Inc. Assessor’s Map 33, Parcel 17. The proposed construction of an addition to a single family dwelling. Work will occur within 100’ of the Top of an Inland Bank/Edge of Bog.
Certificate of Compliance
Michael W. & Rosanne D. Panio (1992) 197 Quanset Road
The request for a Certificate of Compliance for an Order of Conditions for the placement of chink stone to control erosion on the bank.
Michael W. & Rosanne D. Panio (2009) 197 Quanset Road
The request for a Certificate of Compliance for an Order of Conditions for bank restoration and stabilization.
Breakwater Enterprises (2005) 11 Center Place
The request for a Certificate of Compliance for an Order of Conditions for the construction of 2 townhouse buildings with a total of 5 apartments; the installation of a septic system to serve the new units and 2 existing buildings; grading, and landscaping.
Edward Filardi (2002) 29 Payson Lane
The request for a Certificate of Compliance for an Order of Conditions for the construction of a single-family dwelling; guest house; pool; driveway construction; grading; the installation of a sewage disposal system; and the construction of a path, stairs, and landing to access Pochet Inlet.
Edward Filardi (2005) 29 Payson Lane
The request for a Certificate of Compliance for an Order of Conditions for Vegetation Alteration greater than 50’ from the Top of the Bank.
Richard Miller (2008) 10 Little Marsh Lane
The request for a Certificate of Compliance for an Order of Conditions for the installation of utilities, access steps, and mitigation plantings.
Administrative Reviews
Towhee Lane Association 49 Towhee Lane
The proposed removal of invasive species along a beach access path. Work will occur within 100’ of the Top of a Coastal Bank and Land Subject to Coastal Storm Flowage. Work to be done by Blue Flax Design.
Bruce & Amy Albert 49 Sparrowhawk Road
The proposed clearing of a view. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C. Work to be done by Tim Baker, Baker Tree Service.
Barbara Kraushaar 29 & 33 Keziah’s Lane
The after the fact pruning of an existing path for water access. Work occurred within 100’ of the Top of a Coastal Bank and Salt Marsh, and within Land Subject to Coastal Storm Flowage and the Pleasant Bay A.C.E.C.
John B. & Marcia W. Sortor 30 Pershing Lane
The proposed trimming of trees for view restoration and removal of bittersweet and poison ivy. Work will occur within 100’ of the Top of a Coastal Bank and within Land Subject to Coastal Storm Flowage and the Pleasant Bay A.C.E.C.
Phil & Loretta Fair 14 Megs Lane
The proposed construction of a handicap access ramp. Work will occur within 100’ of the Edge of Wetland, Edge of Crystal Lake, and within the Pleasant Bay A.C.E.C.
Philip Benton 34 Twinings Lane
The proposed annual reduction in canopy height of several oaks located in the rear view corridor. Work to be done within the Pleasant Bay A.C.E.C. and on the Coastal Bank. Work to be done by Bartlett Tree Company.
Chairman’s Business
Approval of the Minutes from the Meeting on September 11, 2012
Other Member’s Business
Administrator’s Business
Site Visits
Michael W. & Rosanne D. Panio 197 Quanset Road
by Coastal Engineering Company, Inc. Assessor’s Map 93, Parcel 11. The proposed reconfiguring of an existing licensed float. Work will occur on Land Under the Ocean, in Quanset Pond, and within the Pleasant Bay A.C.E.C.
Joyce & Steven Davis 12 Mill Race
by Lucas Environmental, Assessor’s Map 29, Parcel 42. The proposed conversion and expansion of an existing shed on sonotube footings to living space and the hand digging and installation of one sonotube. Work will occur within 100’ of the Top of a Bank, Edge of Mill Pond, and Bordering Vegetated Wetland.
Julian T. & Elaine F. Baird 4 Mayflower Circle
by Ryder & Wilcox, Inc. Assessor’s Map 56, Parcel 15-2. The proposed replacement of dug-in steps with new dug-in steps and an elevated stairway, and the removal of 2 locust trees on a Coastal Bank. Work will occur on a Coastal Bank, on a Beach, on Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|