Orleans Conservation Commission
Hearing Meeting Nauset Room August 21, 2012
8:30 a.m. Call to Order
Continuations
Last Heard 8/7/12 (JB1)
Cove Condominium Trust 13 South Orleans Road
by East Cape Engineering, Inc. Assessor’s Map 26, Parcel 64. The proposed replacement of a seasonally removed pier, ramp, and float with a permanent pier and seasonally removed ramp and float. Work will occur in Land Subject to Coastal Storm Flowage, on a Salt Marsh, and in Land Containing Shellfish.
Last Heard 8/14/12 (JO1)
George & Carolann Najarian 33 Bufflehead Lane
by Ryder & Wilcox, Inc. Assessor’s Map 1, Parcel 27. The proposed replacement of an existing culvert, removal of cattails, and phragmites, has been amended to remove the culvert replacement from the proposed plan. Work will occur within a Salt Marsh, in a Bordering Vegetated Wetland, on Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of a Salt Marsh.
Notice of Intent
Moncrieff Cochran 34 & 40 Horseshoe Lane
by Land Design Associates, Assessor’s Map 89, Parcels 10,11,12, &13. The proposed clearing and pruning for a view corridor and removal of invasive species. Work will occur within 100’ of the Top of a Coastal Bank, within Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.
Robert & Beatrice Heath 14 Orissa Drive
by J.C. Ellis Design, Inc. Assessor’s Map 57, Parcel 14. The proposed upgrade of an existing septic system. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.
Revised Plan
65 Old Colony Way LLC 65 Old Colony Way
The proposed construction a single office building and mitigation plantings has been revised to change the location of the proposed driveway. Work will occur within 100’ of the Edge of Wetland.
Certificate of Compliance
Mary Allen Bradley (2010) 4 Etta’s Way
The request for a Certificate of Compliance for an Order of Conditions for the construction of a detached garage/studio, a flagstone patio, walkway, and mitigation plantings.
Basil & Elizabeth Bourque (2009) 7 Blossom Lane
The request for a Certificate of Compliance for an Order of Conditions for the removal of invasive species and planting of native species for habitat and view enhancement.
Livingston Van De Water (2002) 225 Brick Hill Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a driveway and grading. No work occurred under this Order.
Livingston Van De Water (2011) 225 Brick Hill Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a gravel driveway.
Administrative Reviews
Maureen Brusie 52 Tides End Lane
The proposed replacement of PT decking with PVC decking on 2 front stoops and rear deck, framing to remain, and no ground work. Work will occur within 100’ of the Edge of a Salt Marsh, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C. Work to be done by Tom Hughes Building Corporation.
Bruce M. & Sheryl K. Wolf 16 Blake Lane
The proposed trimming of shrubs in a view easement. Work will occur within 100’ of the Top of a Coastal Bank and within the Pleasant Bay A.C.E.C.
Joan Mayer 57 Kenneth Lane
The proposed after the fact replacement of platform and stair section. All work was done by hand and occurred within the existing footprint. Work had occurred within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, Salt Marsh, and within the Pleasant Bay A.C.E.C.
Raymond Nash 46 Loomis Lane
The proposed removal of two dead/dying oaks. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.
Steven Cahill 40 Lake Drive
The proposed removal of 4 dead pitch pines and 1 oak tree. Work will occur within 100’ of the Edge of an Inland Pond and Bordering Vegetated Wetland.
Aldo Giacco 4 Champlain Road
The proposed construction of a 3x5’ landing and stairs alongside an existing deck to connect to the lower level and installation of two sonotubes. Work will occur within 100’ of the Edge of Wetland.
Sandy MacFarlane 160 Tonset Road
The proposed removal of oak and locust saplings within the existing view corridor. Work will occur within 100’ of the Top of a Coastal Bank. Work to be done by applicant.
Request to Use Conservation Properties
Windmill Wedding Photos 8/11/12
Dincecco/Williamson 24 People 4-6pm
Kent’s Point Educational Walk 8/23/12
Orleans Conservation Trust 20-30 People 10am-12pm
Chairman’s Business
Approval of the Minutes from the Meeting on August 14, 2012
Other Member’s Business
Administrator’s Business
Permit Extension Act Update.
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|