Orleans Conservation Commission
Hearing Meeting Skaket Room August 7, 2012
8:30 a.m. Call to Order
Continuations
Last Heard 7/3/12
Cove Condominium Trust 13 South Orleans Road
by East Cape Engineering, Inc. Assessor’s Map 26, Parcel 64. The proposed replacement of a seasonally removed pier, ramp, and float with a permanent pier and seasonally removed ramp and float. Work will occur in Land Subject to Coastal Storm Flowage, on a Salt Marsh, and in Land Containing Shellfish.
Last Heard 7/24/24 (JO1)
George & Carolann Najarian 33 Bufflehead Lane
by Ryder & Wilcox, Inc. Assessor’s Map 1, Parcel 27. The proposed replacement of an existing culvert, removal of cattails, and phragmites, has been amended to remove the culvert replacement from the proposed plan. Work will occur within a Salt Marsh, in a Bordering Vegetated Wetland, on Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of a Salt Marsh.
Notice of Intent
Eric & Reva Gold Fischman 27 Ruggles Road
by Ryder & Wilcox, Inc. Assessor’s Map 11, Parcel 21. The proposed installation of dug-in steps to replace an existing paved walk & to provide access to Town Cove. Work will occur on a Coastal Bank, in Land Subject to Coastal Storm Flowage, and within the buffer zone of the Top of a Coastal Bank.
Franklin & Kimberly Moss 46 Old Field Road
by Ryder & Wilcox, Inc. Assessor’s Map 64, Parcel 3. Proposed landscaping; the rebuilding of stairs & second floor deck attached to an existing single family dwelling; & mitigation plantings. Work will occur within 100’ of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.
Administrative Reviews
Last Heard 7/24/12
Gerry Nolin 125 Rock Harbor Road
The proposed removal of one tree and installation of underground utilities. Work will occur within 100’ of the Edge of a Salt Marsh and Edge of Wetland.
Roberta Hurlburt 41 Nauset Road
The proposed installation of a storage shed and removal of rosa rugosa. Work will occur within 100’ of the Top of a Coastal Bank. Work to be done by Pine Harbor.
Gail Lindsay Iliff 33 Bufflehead Lane
The proposed removal of a dead cedar tree. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and the Edge of Wetland. Work to be done by S & L Tree Service.
Aldo Giacco 4 Champlain Road
The proposed replacement of existing steps, wall, regrading of existing steps, and removal of a tree. Work will occur within 100’ of the Edge of Wetland.
Ann Stevens/Peter Henry 29/30 Gull Lane
The proposed removal of phragmites. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, and within Cape Cod Bay A.C.E.C. Work to be done by Wilkinson Ecological Design.
The VS Realty Trust 17 Weeset Proprietors Way
The after the fact upgrading of an existing septic tank. Work occurred within 100’ of the Top of a Coastal Bank.
Doug & Jennie Jacoby 10 Nauset Road
The proposed installation of underground utilities with trenches to be backfilled. Work will occur within 100’ of the Edge of Wetland.
Request to Use Conservation Properties
Windmill Baptizm 8/19/12
Swidzinski 11am-2pm 30 People
Chairman’s Business
Approval of the Minutes from the Meeting on July 24, 2012
Other Member’s Business
Administrator’s Business
Bathing Beach Regulations for Conservation Properties.
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|