Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2012/06/05
Orleans Conservation Commission                                 

Hearing Meeting Nauset Room                     June 5, 2012
8:30 a.m.       Call to Order   

Continuations
Last Heard 3/6/12 (JT1, JO1)
Town of Orleans                                         Quanset Road
by GHD Inc..  The proposed repair of an existing culvert.  Work will occur within 100’ of Meadow Bog Pond, Little Quanset Pond, Land Subject to Coastal Storm Flowage, Edge of Salt Marsh, and the Pleasant Bay A.C.E.C.

Last Heard 5/1/12
Lawrence P. & Anne P. Gaine                             6 Marshwind Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 31, Parcel 14.  The after the fact construction of a larger dwelling than previously approved and the after the fact clearing of a path in a Salt Marsh.  Work occurred within 50’ of a ditch, on a Salt Marsh, on Land Subject to Coastal Storm Flowage, and in the Inner Cape Cod Bay A.C.E.C.

Notice of Intent
John Cooper & Lynne Eickholt                            39 Old Duck Hole Road
by Ryder & Wilcox, Inc. Assessor’s Map 37, Parcel 66.  The proposed removal of invasive species, planting of native species, and establishment of a view corridor.  Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, and in the Pleasant Bay A.C.E.C.  

Charles Silbert                                         33 Gesner Road
by East Cape Engineering, Inc. Assessor’s Map 42, Parcel 89.  The proposed removal of an existing dwelling and cesspool, and the construction of a new single family dwelling, garage, driveway, and septic system.  Work will occur within 100’ of the Edge of Wetland, Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C.  

Certificate of Compliance
David Hobson (2009)                                     58 Pershing Lane
The request for a Certificate of Compliance for an Order of Conditions for the construction of 2 additions to an existing dwelling and mitigation plantings.

Revised Plan
Joseph Boughan                                          4 Cole Place
The proposed construction of a pool has been revised to change the location of the proposed pool fence and to replace the cedar tree removed during construction.  Work will occur within 100’ of the Edge of Wetland.

Administrative Reviews
Mark Kritzman                                           204 Barley Neck Road
The proposed removal of a dead cedar tree.  Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C.  Work to be done by Uncommon Ground.

Lindsay Iliff                                                   33 Bufflehead Lane
The proposed removal of a dead pine tree.  Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and Edge of Wetland.  Work to be done by S&L Tree services.

Laura Arnold                                                    18 Towhee Lane
The proposed trimming of the understory of 4-5 trees.  Work will occur within 100’ of the Edge of Wetland and the Edge of Deep Pond.  

Request to Use Conservation Properties
Windmill                Celebrate our Waters Weekend                    9/22/12 & 9/23/12
OPC                     10am-12pm                                               10-30 People

Chairman’s Business
Approval of the Minutes from the Meeting on May 22, 2012

Other Member’s Business

Administrator’s Business
John Jannell to report on the status of 64 Tonset Road.

Site Visits

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.