Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2012/04/03
** REVISED**

Orleans Conservation Commission                                 

Hearing Meeting Nauset Room                     April 3, 2012
8:30 a.m.       Call to Order   

Continuations
Last Heard 3/6/12 (JT1, JO1)
Town of Orleans                                         Quanset Road
by GHD Inc..  The proposed repair of an existing culvert.  Work will occur within 100’ of Meadow Bog Pond, Little Quanset Pond, Land Subject to Coastal Storm Flowage, Edge of Salt Marsh, and the Pleasant Bay A.C.E.C.

Last Heard 3/6/12 (JT1)
Peter A MacBride                                        19 Gosnold Road
by Ryder & Wilcox, Inc, Assessors Map 45 Parcel 12. The proposed after the fact cutting in a view easement and proposed restoration plantings.   Work occurred and will occur within the Pleasant Bay ACEC, on a Coastal Bank, and within 100’ of the Top of a Coastal Bank.

Last Heard 3/27/12 (JB1)
Robert J. Anslow, Jr. Et Al                                     46 Freeman Lane
by Ryder & Wilcox, Inc.  Assessor’s Map 5, Parcel 27.  The proposed establishment of a view corridor.  Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of Salt Marsh and Top of a Coastal Bank.

Notice of Intent
David Keeffe                                                    124 Monument Road
by Land Design Associates, Assessor’s Map 55, Parcel 24.  The proposed construction and repair of stone walls and steps, construction of a granite cobble apron, and mitigation plantings.  Work will occur within 50’ of the Edge of Wetland, 50’ of the Edge of Crystal Lake, and within the Pleasant Bay A.C.E.C.  

Restoration Plan
Vivian Robinson                                         7 Wildflower Lane
by Wilkinson Ecological Design, Assessor’s Map 23, Parcel 22.  The proposed restoration plan for work performed without permits.  Work has occurred within Land Subject to Coastal Storm Flowage, within a Wetland, and within 50’ of the Edge of Wetland.

Revised Plan
Peter & Susan Worley                                    26 Deer Run
The proposed construction of a 4-bedroom dwelling and an attached garage has been revised to change the configuration of the building with an increase in total square footage of 574 square feet. Work will occur within 100 ‘of the Top of a Coastal Bank and Land Subject to Coastal Storm Flowage.

Certificate of Compliance
Susan Wright (1994)                                     24 Uncle Vick’s Way
The request for a Certificate of Compliance for an Order of Conditions for the construction of a Title V septic system.

Discussion
George & Carolann Najarian                              33 Bufflehead Lane
The proposed changing of Contractor for the replacement of an existing culvert (located within the Bufflehead Lane layout and the Illiff property at 33 Bufflehead Lane) and the removal of cattails and phragmites from the pond and bordering vegetated wetland on the Najarian property at 123 Freeman Lane.  

Administrative Reviews
Last Heard 3/27/12 (JB1)
David Reibstein                                         32 Arey’s Lane
The proposed pruning of oak trees.  Work will occur within the Pleasant Bay A.C.E.C., Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of Arey’s Pond.  Work to be done by David Gilmore.  

Christopher & Jenna Sammartino                          17 Old Farm Road
The proposed removal of 2 oak trees leaning towards the house, 3 locust trees, and 1 standing dead cherry tree.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Robb Morrison Tree Service.  

Town of Orleans/Parks & Beach Department                Nauset Beach
The proposed digging out of steps at Nauset Beach.  Work will occur on a Coastal Dune, Coastal Bank, in Land Subject to Coastal Storm Flowage, and within 100’ of a Coastal Beach.

Steve Simon                                                     24 Beach Road
The proposed removal of fallen limbs, cutting of briars, and the removal of 2 dead trees.  Work will occur within 50’ of the Edge of Wetland.  Work to be done by applicant.

Herbert Gullquist                                               22 Indian Fort Hill
The proposed removal of one pine tree.  Work will occur within 100’ of the Top of a Coastal Bank.  Work to be done by Albert Avellar.

Lee Klotz                                                       8 Sea Breeze Lane
The proposed removal of 1 Norway Maple and the pruning of 1 Hawthorn and 1 Oak tree.  Work will occur within 100’ of the Edge of Wetland and the Cape Cod Bay A.C.E.C.  Work to be done by All Seasons Landscaping.

Chairman’s Business
Approval of the Minutes from the Meeting on March 27, 2012

Other Member’s Business

Administrator’s Business

Site Visits

The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting.  Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.