Orleans Conservation Commission
Work Meeting Skaket Room March 27, 2012
8:30 a.m. Call to Order
Continuations
Last Heard 3/6/12 (JT1)
Peter A MacBride 19 Gosnold Road
by Ryder & Wilcox, Inc, Assessors Map 45 Parcel 12. The proposed after the fact cutting in a view easement and proposed restoration plantings. Work occurred and will occur within the Pleasant Bay ACEC, on a Coastal Bank, and within 100’ of the Top of a Coastal Bank.
Last Heard 3/20/12 (JO1)
Robert J. Anslow, Jr. Et Al 46 Freeman Lane
by Ryder & Wilcox, Inc. Assessor’s Map 5, Parcel 27. The proposed establishment of a view corridor. Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of Salt Marsh and Top of a Coastal Bank.
Certificate of Compliance
Alan Taber (1992) 16 Uncle Ben’s Way
The request for a Certificate of Compliance for an Order of Conditions for the construction of a Title V septic system.
Administrative Reviews
Last Heard 3/6/12 (JT1, JO1)
Elaine Downs 58 Tonset Road
The after the fact construction of a chain link fence. Work occurred within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C.
David Reibstein 32 Arey’s Lane
The proposed pruning of oak trees. Work Will occur within the Pleasant Bay A.C.E.C., Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of Arey’s Pond. Work to be done by David Gilmore.
Elizabeth Curtis 108 Arey’s Lane
The proposed removal of 3 locust trees, cutting back of ivy, and the pruning of roses and maple trees. Work will occur within 100’ of a Bordering Vegetated Wetland, Arey’s Pond, and the Pleasant Bay A.C.E.C. Work to be done by Covell Brothers Landscaping.
Richard Beaulieu 33 Herring Brook Way
The proposed removal of existing English Ivy, installation of an 8’ diameter bluestone patio and replacement with 10 Clethra, 4 cranberry viburnum, and fescue. Work will occur within the Pleasant Bay A.C.E.C. and within 100’ of the Top of a Coastal Bank and Land Subject to Coastal Storm Flowage. Work to be done by Daniel Meany.
Sally Mills Patnode 54 Tonset Road
The proposed removal of invasive plants from beach area including bittersweet and phragmites. Work will occur on a Coastal Beach, Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of Salt Marsh. Work to be done by Joe Hamblin.
Nancy DuRie 64 Freeman Lane
The proposed cutting back of invasive vines and topping of small trees. Work will occur within 100’ of the Top of a Coastal Bank and Rachel’s Cove.
James Shaughnessy 90 Nauset Heights Road
The proposed installation of a 10’x10’ shed. Work will occur within 100’ of the Edge of Wetland. Work to be done by Scott Svenningsen.
Discussion on 196A.5 Orleans Wetland Protection Regulations, Fee Schedule
The Conservation Commission will review and discuss changes to 196A.5 Fees.
Chairman’s Business
Approval of the Minutes from the Meeting on March 20, 2012
Other Member’s Business
Administrator’s Business
Site Visits
David Keeffe 124 Monument Road
by Land Design Associates, Assessor’s Map 55, Parcel 24. The proposed construction and repair of stone walls and steps, construction of a granite cobble apron, and mitigation plantings. Work will occur within 50’ of the Edge of Wetland, 50’ of the Edge of Crystal Lake, and within the Pleasant Bay A.C.E.C.
Vivian Robinson 7 Wildflower Lane
by Wilkinson Ecological Design, Assessor’s Map 23, Parcel 22. The proposed restoration plan for work performed without permits. Work has occurred within Land Subject to Coastal Storm Flowage, within a Wetland, and within 50’ of the Edge of Wetland.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|