Orleans Conservation Commission
Work Meeting Nauset Room December 13, 2011
8:30 a.m. Call to Order
Certificate of Compliance
Francis Maloney (2003) 22 Winslow Drive
The request for a Certificate of Compliance for an Order of Conditions for the construction of additions and deck onto an existing single family dwelling. No work occurred under this Order of Conditions.
Revised Plan
Brian & Brianna Seppala 21 Brewster Cross Road
A revised planting plan has been submitted showing an additional landscape wall and the removal of proposed rock features. Work will occur within 100’ of a Bordering Vegetated Wetland. Work to be done by Trish Arrow.
Administrative Reviews
Last Heard 12/6/11 (JB1, JO1)
Norman Eaton 88 Tonset Road
The proposed removal of a locust tree damaged by recent storm events. Work will occur within 100’ of the Top of a Coastal Bank.
Francis Maloney 22 Winslow Drive
The proposed construction of a second story addition and an exterior stairway to access said addition. Work will occur within 100’ of the Edge of Wetland.
Gerald Mulligan 16 Ewing Drive
The proposed installation of a 250 gallon underground propane tank. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within the Pleasant Bay A.C.E.C. Work to be done by Snow’s.
George Brescia 15 Packet Landing
The proposed installation 4’ high chain link fence to extend 240’+/-. Work will occur on a Coastal Bank, within the Pleasant Bay A.C.E.C., within Land Subject to Coastal Storm Flowage, and within 100’ of the Edge of a Salt Marsh and Top of a Coastal Bank. Work to be done by Walpole Woodworks.
Barbara LeStage 12 Haywood Lane
The proposed pruning of a Norway Maple and the removal of two locust trees as a result of recent storm event. Work will occur within 100’ of the Top of a Coastal Bank and the Pleasant Bay A.C.E.C. Work to be done by Bartlett Tree Company.
Steve Simon 24 Beach Road
The proposed removal of one fallen dead locust and locust stumps. Work will occur within 100’ of the Edge of Wetland. Work to be done by applicant.
Rick Porter 52 Beach Road
The proposed removal of 8 oak trees. Work will occur within 50’ of the Top of an Inland Bank and Edge of Wetland. Work to be done by Bartlett Tree Company.
Thomas Woods 7 Larboard Lane
The proposed removal of a broken limb and pruning of a willow tree. Work will occur within 25’ of the Edge of a Pond and a Bordering Vegetated Wetland. Work to be done by Colson’s Landscaping.
Chairman’s Business
Approval of the Minutes from the Meeting on December 6, 2011
Other Member’s Business
Administrator’s Business
Site Visits
Stephen Brodeur 25 Weeset Proprietors Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4. The proposed reconstruction of a stone revetment, installation of stone retaining walls, removal of existing patio areas, and mitigation plantings. Work will occur on the Top of a Coastal Bank, on a Coastal Beach, within Land Subject to Coastal Storm Flowage, and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Land Subject to Coastal Storm Flowage, and the Nauset Estuary.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|