Orleans Conservation Commission
Hearing Meeting Nauset Room December 6, 2011
8:30 a.m. Call to Order
Continuation
Last Heard 11/15/2011 (JO1)
Dan A. Berlinghoff, Donald R. Mattison,
& Margaret Rose Libby Mattison 38 Hinkle Lane
by Ryder & Wilcox, Inc. Assessor’s Map 60, Parcel 14. The proposed construction of a single-family dwelling, installation of a septic system & utilities, & grading & landscaping. Work will occur within 100’ of a Vegetated Inland Wetland and an Inland Pond (Baker’s Pond).
Last Heard 11/15/2011 (JO1)
Frank I. & Sylvia White 31 Canal Road
by Ryder & Wilcox, Inc. Assessor’s Map 18, Parcel 25. The proposed construction of a commercial structure with an apartment, installation of a septic tank connected to an existing leach field, utilities, driveway, grading & landscaping. Work will occur within 100’ of the Edge of Wetland, Ditch, and on Land Subject to Coastal Storm Flowage.
Last Heard 11/22/11 (AH1, AP1)
Vivian Robinson 7 Wildflower Lane
by Felco, Inc. Assessor’s Map 23, Parcel 22. The proposed replacement and extension of an existing deck. Work will occur within Land Subject to Coastal Storm Flowage and within 50’ of the Edge of Wetland.
Notice of Intent
Charles Silbert 40 Gesner Road
by East Cape Engineering, Inc., Assessor’s Map 42, Parcel 91. The proposed removal of an existing dwelling, construction of a single family dwelling, garage, and installation of a new water line and paved driveway. Work will occur within 100’ of the Edge of Wetland, Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C.
Amended Order of Conditions
Mary Hidden 10 Bufflehead Lane
by Ryder & Wilcox, Inc., Assessor’s Map 1, Parcel 25. The proposed removal of invasive species & the planting of native species has been amended to include the installation of a ground mounted solar array. Work will occur within 100’ of a Coastal Bank, Salt Marsh, and Land Subject to Coastal Storm Flowage.
Administrative Reviews
Norman Eaton 88 Tonset Road
The proposed removal of a locust tree damaged by recent storm events. Work will occur within 100’ of the Top of a Coastal Bank.
Town of Orleans/Parks Department Nauset Beach
The proposed planting of 10,000 beach grass plugs on the dune at Nauset Beach between the Gazebo, Bathhouse, and Front Berm. Work will occur on a Coastal Dune, within the Pleasant Bay A.C.E.C., on Land Subject to Coastal Storm Flowage, and within 100’ of a Coastal Beach. Work to be done by the Orleans Parks Department.
Chairman’s Business
Approval of the Minutes from the Meeting on November 22, 2011
Other Member’s Business
Administrator’s Business
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|