Orleans Conservation Commission
Work Meeting Nauset Room October 25, 2011 *REVISED*
8:30 a.m. Call to Order
Continuation
Continued from 9/20/11 (AP1)
Joy Fopiano 16 Honeysuckle Lane
by East Cape Engineering, Inc. Assessor’s Map 23, Parcel 26. The proposed removal, reconstruction, & additions to portions of an existing dwelling has been amended to include the construction of a garage and a shell driveway. Work will occur within 100’ of a Bog and Land Subject to Coastal Storm Flowage.
Marion & Carolyn Kennedy 96 Tonset Road
by Ryder & Wilcox, Inc. Assessor’s Map 26, Parcel 75. The proposed removal of invasive species, vista pruning, planting of native species, and establishment of view corridors. Work will occur on a Coastal Bank and within 100’ of Land Subject to Coastal Storm Flowage.
Lacy Herrmann et al. 1 Harbor View East
by Ryder & Wilcox, Inc. Assessor’s Map 21, Parcel 3. The proposed removal of invasive species, the planting of native species, and establishment of a view corridor. Work will occur on a Coastal Bank and within 100’ of Land Subject to Coastal Storm Flowage.
Certificate of Compliance
Mark & Nancy O’Leary (2005) 24 Franz Road
The request for a Certificate of Compliance for an Order of Conditions for the demolition and reconstruction of a portion of a single family dwelling and deck including mitigation plantings.
Administrative Reviews
Suzanne Carlson 60 Champlain Road
The proposed removal of one dead Cedar and one dead Cherry next to cottage. Work will occur within 100 feet of a Freshwater Wetland.
James Nichols 259 Route 6A
The proposed removal of two pine trees. Work will occur within 100’ of the Edge of Wetland. Work to be done by A to Z Treez.
Laura Arnold 18 Towhee Lane
The proposed removal of a dead leaning pitch pine, pruning of branches over driveway, pruning of 3 Oaks in adjacent to deck, and the removal of an Autumn Olive. Work will occur within 100’ of the Edge of Deep Pond.
Nancy DuRie 64 Freeman Lane
The proposed removal of 3 Black Cherry trees and cutting back of invasive vines. Work will occur within 100’ of the Top of a Coastal Bank and Rachel’s Cove.
Robert Batchelder 66 Gibson Road
The proposed upgrading of an existing septic system including the pumping and filling of cesspools and installation of a new septic pipe. Only the installation of the new septic line will be within the buffer zone. Work will occur within 100’ of the top of a Coastal Bank and Land Subject to Coastal Storm Flowage.
Stephen Onesti 81 Freeman Lane
The proposed removal of 2 Autumn Olives and the annual mowing of a meadow. Work will occur within 100’ of the Edge of Salt Marsh. Work to be done by Ponderosa Landscaping.
Chairman’s Business
Approval of the Minutes from the Meeting on October 18, 2011
Other Member’s Business
Administrator’s Business
Site Visits
Vivian Robinson 7 Wildflower Lane
by Felco, Inc. Assessor’s Map 23, Parcel 22. The proposed replacement and extension of an existing deck. Work will occur within Land Subject to Coastal Storm Flowage and within 50’ of the Edge of Wetland.
Beth & Larry Minear 171 Monument Road
by Littlefield Landscapes, Assessor’s Map 62, Parcel 35. The proposed removal of invasives species and replanting with native species. Work will occur on a Coastal Bank, in the Pleasant Bay A.C.E.C., and within 100’ of the Top of a Coastal Bank and Land Subject to Coastal Storm Flowage.
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|