Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2011/08/02- Revised
Orleans Conservation Commission (revised)                               

Hearing Meeting Nauset Room                     August 2, 2011
8:30 a.m.       Call to Order   

Notice of Intent
Michael & Denise Bernatchez                             30 & 31 Beach Plum Lane
by Ryder & Wilcox, Inc. Assessor’s Map 23, Parcels 5 & 6.  The proposed removal and management of invasive phragmites.  Work will occur within a Salt Marsh, Coastal Bank, on Land Subject to Coastal Storm Flowage, and in the Inner Cape Cod Bay A.C.E.C.

Certificate of Compliance
Hope Thomson (1970 DF-511)                              33 Snow Shore Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a stone revetment.

Hope Thomson (1970 DF-532)                              53 Snow Shore Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of two stone groins in Nauset Harbor.  

Hope Davis (1975 SE 54-9)                               33 Snow Shore Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of a solid stone filled pier (groin) in Nauset Harbor.

Bali Realty Trust (2006)                                        33, 53, & 59 Snow Shore Road
The request for a Certificate of Compliance for an Order of Conditions for the filing, regrading, and planting of a bank landward of an existing stone revetment & groin.

Administrative Review
Dave Hubbard                                            41 Defiance Lane
The proposed hand cutting of phragmites.  Work will occur within 100’ of the Edge of a Salt Marsh, Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and within an A.C.E.C.  Work to be done by applicant.   

Melinda Oleksiak                                                212 Brick Hill Road
The proposed removal of an existing stone patio and replacement with a new stone patio. Work to be done within 100’ of the Edge of Icehouse Pond.  Work to be done by SWS Services.

Constance Wood                                          17 Old Farm Road
The proposed upgrading of an existing septic system.  The existing system located within the buffer zone will be pumped and abandoned, and the proposed new system will be located outside of the buffer zone.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Speakman Construction.

Carol Flynn                                                     18 Countryside Drive
The proposed upgrading of an existing septic system.  Only a new pipe connecting to a second septic tank will be within the buffer zone.  Work will occur within 100’ of the Edge of Wetland.  Work to be done by Speakman Construction.

Martha Abissi                                           33 Old Duck Hole Road
The proposed removal of two pine trees and one choke cherry tree.  Work will occur within 100’ of a Salt Marsh, Land Subject to Coastal Storm Flowage, and within an A.C.E.C.  Work to be done by Ted Brown-ArborTech.

Peter Howell                                                    22 Towhee Lane
Request to create a 3’ wide woodchip path.  Work will occur within 50’ of the Edge of Deep Pond.  Work to be done by applicant.

Request to Use Conservation Properties
Windmill                        Rehearsal Ceremony                      9/16/11
Kotak/Bell                      3-7pm                                           20 People               
 
Windmill                        OPC Windmill Tours                      9/24/11 & 9/25/11
Orleans Pond Coalition  10am-1pm (9/24) 10am-2pm (9/25) 3-15 People

Chairman’s Business
Approval of the Minutes from the Meeting on July 26, 2011

Other Member’s Business

Administrator’s Business


Site Visits