Orleans Conservation Commission
Hearing Meeting Nauset Room April 19, 2011
8:30 a.m. Call to Order
Notice of Intent
Steve Simon 8 & 10 Beach Road
by East Cape Engineering, Inc. Assessor’s Map 36, Parcel 23 & 24. The proposed establishment of a 4’ path through a right of way over 8 & 10 Beach Road, the removal of invasive species, and the planting of native species. Work will occur within 25’ of the Edge of Wetland.
Robert & Nancy Munson 7 Alden Road
by Coastal Engineering Company, Inc. Assessor’s Map 21, Parcel 75. The proposed addition to a single family dwelling and revegetation of a proposed access way. Work will occur within 50’ of the Edge of Two Wetlands
John C. Davidow & Diane Schluman Davidow 29 Beach Plum Lane
by Ryder & Wilcox, Inc. Assessor’s May 23, Page 4. The proposed vista pruning, removal of invasive species, replanting of native species, and establishment of 3 view corridors. Work will occur within the A.C.E.C, and within 100’ of the Edge of Salt Marsh and Land Subject to Coastal Storm Flowage.
Stephen Brodeur 25 Weeset Proprietor’s Way
by Coastal Engineering Company, Inc. Assessor’s Map 6, Parcel 4. The proposed extension of an existing driveway and the construction of a stone retaining wall and access steps. Work will occur on the Top of a Coastal Bank and within 100’ of the Top of a Coastal Bank, Edge of Salt Marsh, Land Subject to Coastal Storm Flowage, and the A.C.E.C.
Amended Order of Conditions
Stephen Ellis 210 Rock Harbor Road
by Ryder & Wilcox, Inc. Assessor’s Map 17, Parcel 91. The proposed installation of a new septic system to serve an existing dwelling, & the pumping & abandonment of an existing cesspool has been amended to include the construction of an addition and deck to an existing garage and the removal of invasive species and replacement with native species. Work will occur within 100’ of the Edge of Wetland, Rock Harbor Creek, and the A.C.E.C..
Revised Plan
Rick Dupont 18 Sages Way
The plan has been revised to include the proposed elimination of the proposed stone steps (106 square feet) to be replaced by a proposed hot tub (82 square feet). A kayak rack with a storage box at the Base of the Coastal Bank is also proposed. Work will occur at the Base of the Coastal Bank and within 100’ of the Top of a Coastal Bank and Edge of Wetland.
Administrative Reviews
Peter Nix 14 Lewis Road
The proposed replacement of a driveway retaining wall, installation of steps from the driveway to the back yard, and the re-setting and leveling of a brick front walkway. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, and the A.C.E.C.
Robert & Christina Mulligan 18 Towhee Lane
The proposed replacement of an existing H-10 septic tank and D-box with H-20 components. All work to take place within the existing driveway. Work will occur within 100’ of the Edge of Deep Pond. Work to be done by J.M. O’Reilly.
Chairman’s Business
Approval of the Minutes from the Work Meeting on April 12, 2011.
Other Member’s Business
Administrator’s Business
Site Visits
|