Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2011/03/15
Orleans Conservation Commission         (revised)                       

Hearing Meeting Nauset Room                     March 15, 2011
8:30 a.m.       Call to Order   

Continuations
Last Heard 3/1/11 (AH1)
Livingston Van De Water                                 225 Brick Hill Road
by Ryder & Wilcox, Inc.  Assessor’s Map 12, Parcel 58.  The proposed installation of a gravel driveway.  Work will occur within 100’ of the Edge of Wetland.  

Notice of Intent
Town of Orleans                                         192 Skaket Beach Road
by GHD Inc. Assessor’s Map 15, Parcel 6.  The proposed stormwater improvements for the Skaket Beach Parking Lot.  Work will occur with Land Subject to Coastal Storm Flowage, Coastal Beaches, Coastal Dunes, and within 100’ of the Top of a Coastal Bank.

Town of Orleans                         Priscilla Road, River Road, Quanset Road,
                                                Gilman Road, & Barley Neck Road
by GHD Inc., Assessor’s Map 13, Between Parcels 62, 76, 79, 86, 87, & 89; Assessor’s Map 42, Between Parcels 18 & 48;  Assessor’s Map 93, Between Parcels 11 &12, & Assessor’s Map 88, Between Parcels 32 & 34; Assessor’s Maps 51 Between Parcels 6 &; & Assessor’s Map 57, Between Parcels 29 & 30.  The proposed stormwater improvements for landings and road layouts.  Work will occur within 100’ of Land Subject to Coastal Storm Flowage, Coastal Dune, and Salt Marsh.  

Administrative Reviews
Town of Orleans                                         Sea Breeze Lane Right of Way
The proposed installation of a water main and water service in the right of way of Sea Breeze Lane.  The water main will be installed along the easterly side of the walkway and the water service will be located within the middle of the roadway.  Work will occur within 100’ of the Edge of Wetland, Top of a Coastal Bank, and the A.C.E.C.

Town of Orleans                                         18 Bay Ridge Lane
Stabilize disturbed slope at highway garage. Install erosion control blanket and seed mix on slope. Cap abandoned outfall pipe.  Remove debris from buffer zone. Work will occur within 100’ of the Edge of a Wetland.

Chairman’s Business
Approval of the Minutes from the Work Meeting on March 8, 2011.
Other Member’s Business

Administrator’s Business

Site Visits