Orleans Conservation Commission
Hearing Meeting Nauset Room March 8, 2011
8:30 a.m. Call to Order
Administrative Reviews
Tony & Robin Davis 45 Arey’s Lane
The proposed repair of an existing block foundation including waterproofing and grout repair and the installation of a safety curb and seats for sailing students. Work will occur within 100’ of the Top of a Coastal Bank and the A.C.E.C. Work to be done by Tony Davis.
Marnie Munger 4 Seal Lane
The proposed removal of 4 Eastern Red Cedars and existing overgrown foundation and island plants. An existing gravel driveway is proposed to be re-surfaced with shells and existing lawn to be re-seeded. Work will occur within 100’ of the Top of a Coastal Bank and Salt Marsh.
Department of Conservation & Recreation Gavigan Property/Skaket Beach
The proposed removal of a portion of the boardwalk at the Gavigan Property west of Skaket Beach. A portion of the boardwalk has fallen onto the beach. Work to be done by DCR.
Betty Hinkley 22 Twiss Road
The proposed removal of the tops of 3 dead Eastern Red Cedars hanging onto property. Work will occur within 100’ of the Edge of Wetland and Vernal Pool. Work to be done by the Tree Wizard.
Margot Basile 180 Main Street
The proposed removal of a leaning dead black locust tree. Work will occur within 50’ of the Edge of Wetland.
Chairman’s Business
Approval of the Minutes from the Work Meeting on March 1, 2011.
Other Member’s Business
Steve Ellis would like to address the board about invasive species removal at 210 Rock Harbor Road.
Administrator’s Business
Site Visits
Town of Orleans 192 Skaket Beach Road
by GHD Inc. Assessor’s Map 15, Parcel 6. The proposed stormwater improvements for the Skaket Beach Parking Lot. Work will occur with Land Subject to Coastal Storm Flowage, Coastal Beaches, Coastal Dunes, and within 100’ of the Top of a Coastal Bank.
Town of Orleans Priscilla Road, River Road, Quanset Road,
Gilman Road, & Barley Neck Road
by GHD Inc., Assessor’s Map 13, Between Parcels 62, 76, 79, 86, 87, & 89; Assessor’s Map 42, Between Parcels 18 & 48; Assessor’s Map 93, Between Parcels 11 &12, & Assessor’s Map 88, Between Parcels 32 & 34; Assessor’s Maps 51 Between Parcels 6 &; & Assessor’s Map 57, Between Parcels 29 & 30. The proposed stormwater improvements for landings and road layouts. Work will occur within 100’ of Land Subject to Coastal Storm Flowage, Coastal Dune, and Salt Marsh.
|