Orleans Conservation Commission
Hearing/Work Meeting Nauset Room October 5, 2010
8:30 a.m. Call to Order
Notices of Intent
David J. & Pamela L Driscoll 26 Horseshoe Lane
The proposed stabilization of a coastal bank. Work will include the removal of several trees, installation of fiber rolls and replanting of the area with native species. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, and within 100 feet of the Top of a Coastal Bank.
Vincent Ollivier & Kevin Galligan 22 Great Oak Road.
The proposed removal of a portion of an existing dwelling and the construction of additions to a single-family dwelling. Work will occur within 100 feet of an Inland Bank.
Ethel Alemian 41 Willie Atwood Road
The proposed installation of a new septic system including the abandonment of existing cesspools, conversion of the existing well to an irrigation well, and the installation of town water. Work will occur within 100 feet of the Top of a Coastal Bank.
Rosemary King Nelson & Robert King 16 Haywood Lane
The proposed modification of an existing Chapter 91 Waterways License. The pier is located on a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and Land under a Body of Water.
Amended Order
Daniel & Andrea Schmeig 13 Kingsbury Lane
The proposed demolition of an existing dwelling & construction of a new dwelling & swimming pool has been amended to include an extension of the existing fiber roll toe protection. Work will occur within 100’ of the Top of a Coastal Bank.
Continuations
Continued from 9/21/2010
Patrick & Janet Regan 21 Tanglewood Terrace
by Ryder &Wilcox, Inc. and Assessor’s Map 20, Parcel 82,. The proposed removal of invasive plants and planting of native plants. Work will occur on and within the buffer to a Coastal Bank.
Continued from 9/21/2010
Michael Levangie & Sandra Lucchesi, 55 Freemans Lane.
by Ryder & Wilcox, Inc. and Assessor’s Map 5, Parcel 31. The proposed construction of a sunroom, swimming pool, and patio. Work will occur within 100 feet of a Coastal Bank and Land Subject to Coastal Storm Flowage.
Certificates of Compliance
Richard & Jenny Cohen (1999) 14 Viking Road
Request to issue the Certificate of Compliance for the proposed installation of a deck and porch, construction of a path, and removal of a tree; the porch was not built. The deck has an entranceway from the front as well as the side. The site is well vegetated.
Ross Bierkan (Hallowell RT) 2005 20 Bufflehead Lane
No work was done under this Order for a second story addition.
Ross Bierkan (Mc Crossan)2006 20 Bufflehead Lane
COC request for an Order to remove and rebuild a dwelling. The dwelling was built as shown on the site plan with the addition of 3 AC units on the north side of the dwelling. The 7 trees proposed to be planted in the old driveway were not planted in the driveway. This area is now an extension of the lawn.
Ross Bierkan (2007) 20 Bufflehead Lane
COC request for an Order to remove invasive species and replant native species. The 7 trees proposed to be planted in the old driveway were not planted in the driveway. This area is now an extension of the lawn.
Administrative Reviews
Estate of Maureen Schouman 51 Briar Springs Road
Request to remove, pump, and fill two existing cesspools. Work to be done within 100’ of the Top of a Coastal Bank right next to the paved driveway. Work to be done by AMA.
Walter North/Judy Ryon 178 Barley Neck Road
This Administrative Review was previously approved September 3, 2009, but work had not been completed. Request to remove invasive species and plant native ones. Work near the street will be approved by the Tree Warden before going forward. Work will occur within 100’ buffer zone of a Freshwater Wetland.
Harvey & Muriel Gross 60 Briar Springs Road
Request for annual mowing of town landing area to prevent reoccurrence of invasive species, maintain 4’ wide path, and lower surrounding bramble to a height of 3’. This is maintenance for the work completed under an Administrative Review from April 21, 2009 by Wilkinson Ecological. Work within the 100’ buffer to a coastal bank.
Philip Fair 14 Megs Lane
Request to remove two pitch pines too near the dwelling and the hollow trunk of a large oak that could fall on the boat storage area. This oak has another healthy trunk. Work within 100’ to Crystal Lake. Work to be done by A to Z Treez.
Judith Brainerd 9 High Tide Lane
Request to remove one dying red cedar and replace it with a tupelo. Work within the buffer to a freshwater wetland.
The Orleans Yacht Club 39 Cove Road
Request to re-shingle the roof, relocate the kitchen exhaust fan and re-build the spar-mast shed. Work is within the buffer to a coastal bank.
Request to Use Conservation Property
Windmill Wedding 7/9/11
Thomas Murphy & Kathryn Pelton 50-60 People 3-5pm
Chairman’s Business
Approval of the Minutes from the Work Meeting on September 28, 2010.
Other Member’s Business
Administrator’s Business
|