Hearing/Work Meeting Nauset Room February 16, 2010
8:30 a.m. Call to Order
Notices of Intent
Peter Clinton 68 Namequoit Road
by Ryder & Wilcox, Inc. Assessor’s Map 69, Parcel 37. The proposed construction of an earthen berm landward of an existing bulkhead, & the installation of fiber rolls to the east. Work will occur on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay ACEC.
Richard & Marcia Johannesen 40 Viking Road
by Ryder & Wilcox, Inc. Assessor’s Map 70, Parcel 26. Proposed extension & repairs to an existing Licensed pier; view cutting, & habitat improvement. Work will occur on a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, & within the Pleasant Bay ACEC.
Eugene & Mary Hornsby 19 & 21 Little Bay Road
by Ryder & Wilcox, Inc. Assessor’s Map 82, Parcels 3 & 4. Proposed installation of gabion toe protection with a sand cover. Work will occur on a Coastal Bank, Coastal Beach, within Land Subject to Coastal Storm Flowage & the Pleasant Bay ACEC.
Continuations
East Egg Homeowner’s Association 19 Little Bay Road
Last heard: 11/17/09
by Ryder & Wilcox, Inc. Assessor’s Map 82, Parcel 4. Proposed stabilization of the toe of an eroding bank beneath an existing timber stairway. Work will occur on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage & within the Pleasant Bay ACEC.
James & Daphne Hughes 5 Skaket Circle
Last heard: 1/19/10
by East Cape Engineering, Inc. Assessor’s Map 24, Parcel 47. The proposed construction of an addition onto an existing dwelling, enclosing a screened porch, & the installation of a wastewater tight tank. Work will occur in the 100’-buffer to a Salt Marsh & 2 Freshwater Wetlands, & within Land Subject to Coastal Storm Flowage & the Cape Cod Bay ACEC.
Miller/Carpenter 31 Woodsneck Road
Last heard: 1/19/10
by East Cape Engineering, Inc. Assessor’s Map 45, Parcel 9. The proposed reconstruction of portions of an existing dwelling; construction of a screened porch, second floor addition, new deck, residing, window replacement, & roof repair. Work will occur within 100’ of the Top of a Coastal Bank, & within the Pleasant Bay ACEC.
Certificate of Compliance
John Coughlan (2006) 15 Blue Heron Way
This COC request for a single-family dwelling was heard March 25, 2008 and held for an As-Built Plan and for vegetation work to be viable after 3 years in 2010. The AS-Built Plan was accepted on July 22, 2008. The vegetation mitigation has grown in and is stable. The Continuing Conditions to remain on this property include: 1. No plumbing in the boat house; 3. The buffer zone planting established along the salt marsh must remain as part of all land transfers.
Administrative Reviews
John Coughlin 15 Blue Heron Way
Request to remove two large pitch pines. One is infested with black turpentine beetles and the other has dropped several limbs on the nearby boathouse. The boathouse blocks most of the view from the dwelling so removal of these trees will not leave an open view.
Pam Peedin 40 Gibson Road
Request to construct two dormers and replace/exchange windows and doors, including the addition of an entranceway overhang, and the replacement of garage doors with windows. The dwelling comes within 10’ of the top of a Coastal Bank. The entire dwelling is within 60’ of the bank. There is an outstanding Order for an addition and a patio that does not have a Certificate of Compliance. The coastal stairway is not very stable and is built partly on the adjacent property.
Mark Adorney 47 Twiss Road
Request to remove 3 pitch pines--two with storm damage, and one leaning over the neighbor’s property. 5 red cedars will be planted as a replacement. Two other pitch pines will be pruned of broken branches.
Chairman’s Business
Approval of the Minutes from the Work Meeting on February 9, 2010.
Other Member’s Business
Administrator’s Business
|