Skip Navigation
This table is used for column layout.
 
ConserveAgendas 2010/01/12
Orleans Conservation Commission                                 

Work Meeting    Nauset Room                     January 12, 2010
8:30 a.m.       Call to Order   

Continuation
Carolyn Broman                                          5 Broman Place
Last heard:  11/3/09, 12/15/09
by Felco, Inc.  Assessor’s Map 69, Parcel 3.  Proposed work is to obtain approval for the continued use of 2 sections of elevated walkway from the existing Licensed dock landward to the existing access path.  The walkway is within the Resource Area.

Certificates of Compliance
Kurt Martin (2007)                                              43 Rayber Road
COC request for an Order for a dwelling and barn is built as shown on the Site Plan with the addition of 3 rock retaining walls and an extension onto the deck greater than 75’ to the wetland. An As-Built Plan was submitted.

Edgewater Orleans Associates, LLC (2006)                148 Route 6A
COC request for an Order to construct 3 buildings with condominium units. One of these buildings is within the 100’ buffer to a freshwater wetland. On this building, decks were built instead of patios. These decks do not extend as close to the wetland as the patios would have. Other additions within the 100’ buffer are an air-conditioning unit off the southeast side of this building and a fenced-in enclosure for utilities. Additions outside of the 100’ buffer include walkways.  An As-Built Plan has been submitted showing the decks, the air-conditioning unit, the utilities, and the walkways. The gutters were proposed to be connected to a storm drainage system. This has not been done. A Planting Plan by Philip Cheney was approved with the Order. This Plan has not been followed. The Applicant has submitted a new Planting Plan to be completed under an AR along with the installation of dry wells (please see below) as the Order expired July 21, 2009. The new Planting Plan provides screening and a buffer. The Applicant will be required to plant enough plants to provide good cover.

Administrative Reviews
Edgewater Orleans Associates, LLC                       148 Route 6A
Request to install a Planting Plan by Cape Coastal Nursery and downspouts connected to dry wells for Building 3.

Jim Bast                                                        128 Monument Road
Request to repair the siding and roof of the building next to the tennis court with no increase to the building. The edge of this building is within 100’ to a cranberry bog.

Daniel and Andrea Schmieg                               13 Kingsbury Lane
Request to reinstall fiber rolls using a ¼” aircraft cable with copper sleeves instead of the galvanized steel cable used during the original installation. We are holding a large bond on this project.

Barbara Barnette                                                66 Tides End Lane
Request to re-roof the main 2-story section of the house with asphalt shingles within the buffer to a Coastal Bank. The existing shingles are to be removed, placed in a trailer, and brought to Daniels Recycling. Work by Tom Hughes.

Request for an Extension
Man-Kong Tsui (2007)                                    31 Ruggles Road
Request to extend an Order for landscaping for 1 year to May 25, 2011.

Request to Use a Conservation Area
Windmill Park                     Wedding                       6/26/2010
Robb Zarges/Suzanne Swedberg       80 people             11:00-3:00

Chairman’s Business
Approval of the Minutes from the Hearing/Work Meeting on January 5, 2010.

Other Member’s Business

Administrator’s Business

Site Visits
Notices of Intent
James & Daphne Hughes                                    5 Skaket Circle
by East Cape Engineering, Inc.  Assessor’s Map 24, Parcel 47.  The proposed construction of an addition onto an existing dwelling, enclosing a screened porch, & the installation of a wastewater tight tank.  Work will occur in the 100’-buffer to a Salt Marsh & 2 Freshwater Wetlands, & within Land Subject to Coastal Storm Flowage & the Cape Cod Bay ACEC.  

Miller/Carpenter                                                 31 Woodsneck Road
by East Cape Engineering, Inc.  Assessor’s Map 45, Parcel 9. The proposed reconstruction of portions of an existing dwelling; construction of a screened porch, second floor addition, new deck, residing, window replacement, & roof repair. Work will occur within 100’ of the Top of a Coastal Bank, & within the Pleasant Bay ACEC.