Orleans Conservation Commission
Hearing/Work Meeting Nauset Room November 3, 2009
8:30 a.m. Call to Order
Notices of Intent
Southside Realty Trust/Town of Orleans 257 Route 6A
by Coastal Engineering Company, Inc. Assessor’s Map 46, Parcel 52. Proposed construction of 4 dwellings with associated landscaping & utilities. Work is within the 100’ buffer to Isolated Land Subject to Flooding Bordering an Intermittent Stream.
Michael & Rosanne Panio 197 Quanset Road
by Coastal Engineering Company, Inc. Assessor’s Map 93, Parcel 11. Proposed placement of chink stone with an 8” sand cover, placement of soil over gravel on the beach, & planting. Work will occur on a Coastal Bank, Beach, a Salt Marsh, & within the Pleasant Bay ACEC.
Carolyn Broman 5 Broman Place
by Felco, Inc. Assessor’s Map 69, Parcel 3. Proposed work is to obtain approval for the continued used of 2 sections of elevated walkway from the existing Licensed dock landward to the existing access path. The walkway is within the Resource Area.
Joanne Broderick 11 Seaside Drive
by Ryder & Wilcox, Inc. Assessor’s Map 37, Parcel 100. Proposed construction of an addition to an existing dwelling. Work will occur within 100’ of an Inland Wetland & a Vernal Pool.
Certificates of Compliance
John and Marcia Sortor (2006) 30 Pershing Lane
COC request for a demolition and construction of a dwelling. The dwelling is built as shown. The Special Conditions on the Order requested a Landscaping Plan for the old house site. The plants are in but the area has not naturalized with wide separations between the shrubs and mulch. Other Special Conditions stated that the large oak must remain. The oak is there. A spruce tree mentioned in the Special Conditions has been replaced with a red maple. The last Special Condition stated that up to 5 more trees could be requested if the Commission did not think there was enough screening.
Mark Picton (1995) 24 Priscilla Road
COC request for an Order for additions to two dwellings and a new septic system was amended for further additions. An old Revised Plan shows a slightly smaller Dwelling B. An As-Built Plan has been submitted: The driveway has a different configuration. One of the decks on Dwelling B is smaller. The additions to Dwelling A were not built other than a foundation off the west side. The deck on the northwest corner of Dwelling B was not built. The addition has French drains except for over the porch that has a gutter but no drywell. There is a white discharge pipe into the wetland. There is construction rubble in the wetland. There is a propane tank near the wetland. The area around the wetlands was allowed to naturalize. It is mostly privet and honeysuckle.
Administrative Reviews
Robert Wilkinson 20 Pershing Lane
Request to construct a 5’ x 7’second-story cantilevered steel balcony and install a door to the balcony. All work would be by hand. The balcony would be within 22’ of the Top of a Coastal Bank. There is a wide view of the River on this side of the dwelling.
Marcia Alexander 56 Locust Road
Request to cut down phragmites in a small section of beach behind the shed from the cherry tree to the viburnum.
Joan Scannell 21 Pilgrim Lake Terrace East
Request to remove two trees--a pine and an oak--that are shading the dwelling. There is no recent Site Plan on this property. There is a vegetated wetland and possibly a coastal bank that are not shown on the old Site Plan. Work by Matt L’Hommedieu.
Pamela Herrick 8 Kescayogansett Road
Request to replace 7 pilings under the boathouse and put in a new sill on the front. The pilings will raise the building as water is getting into the building on extra high tides. Use fasteners and stainless steel strapping to affix the boathouse to the piling framework. All construction material will be delivered by barge and all debris will be removed from the site onto a barge. Work by Ames Marine Service.
Ralph Sorley 112 Arey’s Lane
Request to remove the top of a maple tree that came down on a boat near the shoreline of Pilgrim Lake. Replace a railroad tie wall around the doorway with landscaping timbers. Remove 1 leaning locust on the path to the Lake. Plant bearberry or other native groundcover on a bare area near the dwelling.
Chairman’s Business
Approval of the Minutes from the Work Meeting on October 27, 2009.
Other Member’s Business
Administrator’s Business
Site Visit
K Designs, LLC 30 Harbor View Lane
by Ryder & Wilcox, Inc. Assessor’s Map 21, Parcel 2. The Order is proposed to be amended for vista pruning & tree removal. Work will occur on & within 100’ of a Coastal Bank.
|