Skip Navigation
This table is used for column layout.
 
Construction Postponed
The construction of the stone breakwater in front of the t-section of the pier, the addition of the lower deck in front of the t-section of the pier, and the replacement of pilings and decking on the pier have been postponed until mid-October 2014. During the construction, the pier will be closed to the public. The construction is expected to continue through the end of March 2015.

The jellyfish nets will be put up the beginning of June. The beach and pier will be open for business as usual!