Conditional Use Approval Application #030-2011
NAME(S): Wynnestay, LLP
AGENT(S): G.F. Johnston and Associates
LOCATION: 125 Peabody Drive, Northeast Harbor
TAX MAP: 3 LOT: 35 ZONE(S): SR2
PURPOSE: Section - 6C.7 - Marine and Freshwater Structure Performance Standards.
SITE INSPECTION: 3:30PM
CHECKLIST
Land Use Zoning Ordinance of the Town of Mount Desert
** Note: All Conclusions of Law are to be read as if they are prefaced by the words “Based upon said Findings of Fact …”
SECTION 6 STANDARDS FOR USES, PERMITS AND APPROVALS
FOR REVIEW BY PLANNING BOARD
6A GENERAL PERFORMANCE STANDARDS
6A.1 Compatibility p; 3-way switch will control lighting from dock or house. 6A.10 Outdoor lighting meets standards.
6B SPECIFIC PERFORMANCE STANDARDS FOR ACTIVITIES AND LAND USES
6B.1 Agriculture X N/A ce="Arial" size="+0" color="#000000" style="font-family:Arial;font-size:9pt;color:#000000;">
Findings of Fact(s): The proposed use will include none of the specific activities or land uses described in section 6B.
VOTE: Findings of Facts 5 - 0
Conclusion of Law: Section 6B is not applicable.
VOTE: Conclusion of Law 5 - 0
Notes:
6C SHORELAND ZONING STANDARDS FOR REVIEW BY PLANNING BOARD
Land Use Standards. All land use activities within the shoreland zone shall conform with the following provisions, if
applicable.
bsp;
Conclusion of Law: Section 6C is not applicable.
VOTE: Conclusion of Law -
6C.1 Agriculture X N/A l;font-size:9pt;color:#000000;">6C.11 Timber Harvesting X N/A :Arial;font-size:9pt;color:#000000;">
FOR BOARD USE
CONDITIONAL USE PERMIT/APPROVAL
APPLICATION: #030-2011
PERMIT CONDITIONS: In addition to having all applicable federal, state, and town permits be in place prior to any construction, the following conditions apply:
All applicable State and Federal permits shall be obtained prior to issuance of permit.
APPLICATION
APPROVED: 1/9/2012 DENIED:
(Date) (Date)
NOTE: The holder of a Conditional Use Permit/Approval must construct and operate the approved conditional use as applied for and as represented during the permitting process to the Planning Board.
NOTE: The Land Use Zoning Ordinance requires that a Conditional Use Permit/Approval must be undertaken within one year from the date of approval, or a new permit must be obtained.
THE MINUTES OF THIS PUBLIC HEARING CONSTITUTE A PART OF THE RECORD FOR THIS MATTER
SIGNATURES OF ALL VOTING BOARD MEMBERS:
Ellen T. Brawley James L. Clunan
Patti Reilly Schofield Andrews
Joseph Tracy ORIGINAL SIGNATURES ON FILE
|