TOWN OF MONTEREY
INVITATION TO BID
ROAD PAVING
The Town of Monterey, acting through the Select board, will accept sealed bids until Monday August 5, 2013 at 9:00 am at the Town Offices, Monterey Grange#291, 435 Main Road, Post Office Box 308, Monterey, MA. 01245. Absolutely no bids will be accepted after that time. The sealed bids are for paving on New Marlborough Road. The project will consist of bituminous concrete binder 2 ½ ” in depth and Mass Top 1 ½ “ in depth, 20feet wide, 3460 feet long. Approximately 2050 tons will be necessary, with an additional 55 tons for aprons. Estimated cost for the paving: $160,000. Total tonnage is approximately 2105 tons. All materials and workmanship are to meet the latest State specifications. Grinding the existing pavement, at each end, may be needed to make a smooth joint. Two, ten
ton rollers will be required for the job. A tack coat shall be applied before applying top coat of asphalt. A sufficient number of trucks for transporting the bituminous concrete to the site will be required. The plane of the finished surface shall be smooth and acceptable to the Director of Operations. The Town of Monterey reserves the right to take a sample out of any haul truck at any given time or check the temperature of the material on the job site in any haul truck. Bidder shall guarantee their work and materiel for a period of one year. Prevailing wage rates shall apply under Chapter 149, Sections 26 and 27.
This contract contains a price adjustment provision for bituminous concrete mixtures. Price adjustments will be in accordance with Mass. Dept of Transportation special provisions for Price adjustments for Hot Mix Asphalt Mixtures E-09-001 dated June 21, 2013. The base price for asphalt cement on this contract is $620.00 per ton.
JOB SHOWING by appointment
BID OPENING August 5, 2013 at 9:00 AM
Bid opening shall take place at the Monterey Town Offices, Monterey Grange #291, 435 Main Road, Monterey, Ma. 01245. Envelopes shall be clearly labeled “Paving Bid”. Bid must include a 5% bid deposit. The successful bidder must furnish a 100% performance bond. Contractor must be prequalified under MGL Chapter 29, Section 8B in accordance with 729CMR 5.00 by MASSDOT. Work shall be completed by September18, 2013. The Town of Monterey, acting through its Select board, reserves the right to waive any informality or to reject any or all bids if deemed to be in the Towns best interest. The MINORITY EMPLOYEE percentage rate to be applied to this project will not be less that 5% in each class. Any questions shall be directed to Director of Operations, Maynard Forbes, 413-528-1734.
Scott Jenssen,
Wayne Burkhart
Muriel Lazzarini, Chair
MONTEREY SELECTBOARD
|  |