Skip Navigation
This table is used for column layout.
 
Conservation Commission Meeting Agenda 10/8/13
TOWN OF MONTEREY CONSERVATION COMMISSION AGENDA

Meeting Date: Tuesday, October 8, 2013
Meeting Time: 6:00pm (Hearings will be heard in the order they are received at the town hall)
Meeting Place: Town Hall Meeting Room

Continued Hearings & Meetings

1.
Hume – 73 Chestnut Hill Rd – NOI – seven foot drawdown of Stedman Pond for dam repairs & improvements (Pixley) filed Oct 2012 plans are being revised, continued to Oct. 8, 2013 meeting
2.
Town – follow up on Enforcement order issued
3.
Hume – 73 Chestnut Hill Rd – SMA NOI – SMA13-02 (Pixley) continued to the Oct. 8, 2013 meeting

New Hearings & Meetings

1.
Quisenberry – 30 Bidwell Rd – RDA - to remove an existing timber dock and replace with a cast-in-place concrete dock structure (Lovett)
2.
Schwartz – Request to extend DEP File # 230-0249
3.
Ryan – 136 Tyringham Rd – RDA – replace roof, construct a storage shed, replace windows, install fencing and construct poultry houses (C. Blair)
4.
Adams/Walker – 8 Lakeside Ave – RDA - to lift the existing structure, pour a new foundation, construct a deck and screen porch and install a new septic system (R. Andrus)
5.
Adams/Walker – 8 Lakeside Ave – SMA NOI (SMA14-01) - to lift the existing structure, pour a new foundation, construct a deck and screen porch and install a new septic system (R. Andrus)
6.
Hartman – 37 Stevens Lake – RDA - to shift & widen the existing driveway, replace existing stone landing and steps, install a stone wall and retaining wall, repair failing channel walls as needed, expand stream bed, remove and reset northernmost bridges and stepping stones and install a water feature , expand road, install electric and water lines to the barn, create a parking area, demo existing patio and boulder/stone walls and install new stone patios and steps, boulder and stone retaining walls and a pergola (B. Pixley)
7.
Vayer – 190 Beartown Mtn Rd – NOI – to construct a 24’ x 24’ garage, re-route the existing driveway, remove an existing deck, construct a larger deck and construct a terrace (D. Dempsey)

Enforcement & Emergency Orders:

1.
Dolber – 142 Main Rd., Enforcement Order (sent 8/12/09) owner has ignored the enforcement order, Commission is contacting town counsel and DEP about pursuing legal action
2.
Smith – Send enforcement order after reviewing pictures taken from the lake (Chris has the file)
3.
Miller – 24 Carrington Battelle Rd – do follow up on planting plan submitted in April of 2010

Misc:

1.
Approve minutes from 9.10.13 meetings
2.
Outline procedures for dealing with downstream impacts.

Special Notes:  
Deadline for paperwork submittal for the Tuesday, November 12, 2013 meeting is: Monday, October 28th by 2pm.

Project Review Schedule:
Oct: Chris Nov: Tim Dec: Rick Jan: Betty