Skip Navigation
This table is used for column layout.
 
Conservation Commission Meeting Agenda 7/13/09
TOWN OF MONTEREY CONSERVATION COMMISSION AGENDA

Meeting Date: Monday, July 13, 2009
Meeting Time: 6:00pm (Hearings will be heard in the order they are received at the town hall)
Meeting Place: Town Hall Meeting Room

Continued Hearings & Meetings


1.
Reid - Sandisfield Rd, NOI 230-0253 – to develop 2 single family home sites with associated infrastructure. (R. Andrus, June 09 meetings)

New Hearings & Meetings


1.
Alpert – White Engineering to review proposal to add a pool in an already disturbed area and review planting plan.
2.
Schwartz – 111 Chestnut Hill Rd – RDA - to upgrade the septic system.  Portions of the work fall within the outer riparian zone of the 200’ Riverfront area (T. Lovett)
3.
Town of Monterey Parks Department – Town Beach – RDA – to add an accessible changing room to the existing porta potty surround and replace stockade fencing (R. Andrus)
4.
Savitt – 221 Beartown Mtn Rd – SMANOI – SMA09-05 – to cut approx 1/3+ acres (C. Blair) RDA from last month should be closed out
5.
Savitt – 221 Beartown Mtn Rd – RDA – to remove 6 trees within 200 feet of a stream bank (C. Blair)
6.
Cangialosi – 18 Laurel Banks – RDA for Emergency Order issued (D. Dempsey)
7.
Cash – 13 Buckingham Lane – RDA – to excavate foundation and install drainage mat against foundation in addition to a footing drain. (T. Lovett)

Enforcement & Emergency Orders:


1.
Cangialosi/M.D. Amstead – Emergency Order – 18 Laurel Banks, applicant to file a RDA.  Board needs to sign EO.
2.
Kalodner – violation; issue enforcement order
3.
Dolber
4.
Smith
5.
Zebra Mussels

Misc:


1.
Review Mail
2.
Approve minutes from 6.8.09 meeting
3.
ZBA application for 9 New Marlboro Rd
4.
Conservation Commission Chairperson rotation discussion
5.
Levkoff/26 Eaton Rd; Phase II discussion
6.
Prepare procedure for filing to repair/replace a dock for website.  New docks require Chapter 91 approved application and RDA filing.  Existing docks
7.
Outline procedures for dealing with downstream impacts.

Special Notes:
Deadline for paperwork submittal for the Monday, August 10th meeting is: Friday, June 26th by 3pm.

Project Review Schedule:
Chris: July Tim: Aug Rick: Sept