Skip Navigation
This table is used for column layout.
 
Conservation Commission Meeting Agenda 8/11/08
Meeting Date: Monday, August 11, 2008
Meeting Time: 6:00pm (Hearings will be heard in the order they are received at the town hall)
Meeting Place: Town Hall Meeting Room

Continued Hearings & Meetings
1.      Kelly/Nadler, 535 Main Rd – review wetlands delineation sent in by Kelly Granger & Parsons continued from 5/07 meeting; no show at June – July meetings
2.      Pearson, 111 Chestnut Hill Rd – NOI 230-0244 – remove siltation from an existing fire pond (Lovett) continued from December hearing; waiting on an amended NOI
3.      Levkoff, 26 Eaton Rd – NOI #230-0246 – improve existing walkpath, construct new walkpath and beach area and install a dock with a boardwalk on Lake Garfield. (D. Dempsey) continued from July meeting
4.      Levkoff, 26 Eaton Rd – SMA-RDA – improve existing walkpath, construct new walkpath and beach area and install a dock with a boardwalk on Lake Garfield. (D. Dempsey) continued from July meeting
5.      

New Hearings & Meetings
1.      Eschen, 12 Sylvan Rd – RDA – construct a dock (T. Lovett) (dock is located at 12 Sylvan Rd via a 50ft easement and Ms. Eschen resides at 11 Sylvan Rd)
2.      Lombardo Group, Pixley Rd (Blue Heron Landing) – NOI – deconstruct 8 existing buildings down to the foundations and reconfigure the existing 6 lots with apartments into 3 single family home lots. (R. Andrus)
3.      Levkoff, 26 Eaton Rd – SMANOI 08-03 – to further develop the site while maintaining the existing single family residential use of the site. (D. Dempsey)

Enforcement & Emergency Orders:
1.      Jaffe letter follow up (removal of wire mesh on split rail fence and fencing installed in the lake)
2.      Property located between Nault and Camp.

Misc:
1.      Review Mail
2.      Approve minutes from 7.14.08 meetings
3.      Prepare procedure for filing to repair/replace a dock for website.
a.      New docks require Chapter 91 approved application and RDA filing.
b.      Existing docks:
4.      Outline procedures for dealing with downstream impacts.

Special Notes:
Deadline for paperwork submittal for the Monday, September 8th meeting is: Tuesday, August 26th by 3:00pm.

Project Review Schedule:
Chris: Aug
Tim: Sept
Rick: Oct