Conservation Commission Meeting Agenda 3/10/08
Meeting Date: Monday, March 10, 2008
Meeting Time: 6:00pm (Hearings will be heard in the order they are received at the town hall)
Meeting Place: Town Hall Meeting Room

Continued Hearings & Meetings
1.      Kelly/Nadler, 535 Main Rd – review wetlands delineation sent in by Kelly Granger & Parsons continued from 5/07 meeting; no show at June – February  meetings
2.      Melzer, 35 Bidwell Rd – SMA RDA – SMA07-03 – (Bach); OOC needs to be written and signed – revised narrative was presented at 12/07 meeting.
3.      Town of Monterey, Lake Garfield – NOI – winter drawdown (Blair) continued to a future meeting; meet with Select Board for input on OOC
4.      Pearson, 111 Chestnut Hill Rd – NOI 230-0244 – remove siltation from an existing fire pond (Lovett) continued from December hearing; waiting on an amended NOI
5.      Pyramid Network Services, Mt Wilcox – RDA – develop new and existing radio sites at the top of Mt Wilcox (Dempsey) review correspondence with DEP since last meeting
6.      Kamenstein – 18 Woodland Drive – the Board requested an updated drawing #01-09-08G showing the actual foundation position and an actual first floor elevation (Andrus) (Con Com is waiting on a report)

New Hearings & Meetings
1.      Rothschild – 4 Brewer Circle – the board is requesting a large fill pile in the buffer zone be covered – site inspection to be done by C. Blair
2.      Neu – 9 Bidwell Rd - RDA– reconstruct an existing house, regrading and stone wall (Lovett)
3.      Mielke – Cronk Rd – SMA RDA – SMA08-01 – site work for proposed house (Blair)

Enforcement & Emergency Orders:
none

Misc:
1.      Review Mail
2.      Approve minutes from 2.11.08 meetings
3.      Prepare procedure for filing to repair/replace a dock for website.
a.      New docks require Chapter 91 approved application and RDA filing.
b.      Existing docks:
4.      Outline procedures for dealing with downstream impacts.

Special Notes:
Deadline for paperwork submittal for the Monday, April 14th meeting is: Friday, March 28th by 3:30pm.

Project Review Schedule:
Dave: March
Chris: April
Tim: May