6:00 |
Popponesset Beach Association, 0 Uncle Percy’s Road. Proposed aquatic management of Dean’s Pond. Applicant requests continuance to 11/13/2014 to allow time to submit wetlands scientist and surveyor plans. |
NOI |
6:03 |
Dean and Linda Schaffer, 133 Popponesset Island Road. Proposed demolition of existing structure and construction of single-family home with deck, stairs and garage as well as new Title 5 septic system. Continued from 8/14/2014. |
NOI |
6:06 |
Aldo R. And Sandra Esposito, 25 Sand Dollar Lane. Proposed installation of a patio area using pavers and field stone. Applicant requests Withdrawal of application. |
RDA |
6:09 |
Alfred and Christine White, 2 Cross Tree Way. Proposed upgrade of septic system. |
RDA |
6:12 |
The Mackin Group, Inc., 76 Triton Way. Request to Amend Certificate of Compliance DEP File No. SE 43-1214 and SE 43-1625. |
ACOC |
6:15 |
James C. Atkins and John J. Weltman, 80 Punkhorn Point Road. Proposed construction of pool, spa, patio, elevated walkway, osprey platform, as well as enhance, restore and expand degraded buffer zone and replace turf. Applicant requests continuance to 10/9/2014 to allow time to submit revised plan showing coastal bank. |
NOI |
6:18 |
Cotuit Solar, LLC, 36 Savannas Path. Proposed renovation of existing structure into commercial space and construction of a warehouse along with utilities, storm-water management, driveways and parking areas. Continued from 8/28/2014 to allow time to submit revised site plan. |
NOI |
6:21 |
Kenneth and Gloria J. Liatsos, 118 Shore Drive West. Proposed coastal bank stabilization (soft solution) and coastal beach mitigation replenishment. Applicant requests continuance to 10/23/2014 to address issues raised at 8/28/2014 meeting. |
NOI |
6:24 |
David and Glenys Pinchin, 124 Shore Drive West. Proposed coastal bank stabilization (soft solution) and coastal beach mitigation replenishment. Applicant requests continuance to 10/23/2014 to address issues raised at 8/28/2014 meeting. |
NOI |
6:27 |
Michael J. and Dawn M. Southwick, 126 Shore Drive West. Proposed coastal bank stabilization (soft solution) and coastal beach mitigation replenishment. Applicant requests continuance to 10/23/2014 to address issues raised at 8/28/2014 meeting. |
NOI |
6:30 |
Bayswater Seaside II LLC, 42 Coastline Drive. Proposed construction of single-family dwelling, swimming pool and landscaping. Applicant requests continuance to 10/9/2014 to submit revised plans showing drywells/runoff containment. |
NOI |
6:33 |
Bayswater Seaside II LLC, 50 Coastline Drive. Proposed construction of single-family dwelling, swimming pool and landscaping. Applicant requests continuance to 10/9/2014 to submit revised plans showing drywells/runoff containment. |
NOI |
6:36 |
Bayswater Seaside II LLC, 60 Coastline Drive. Proposed construction of single-family dwelling, swimming pool and landscaping. Applicant requests continuance to 10/9/2014 to submit revised plans showing drywells/runoff containment. |
NOI |
6:39 |
Bayswater Seaside II LLC, 66 Coastline Drive. Proposed construction of single-family dwelling, swimming pool and landscaping. Applicant requests continuance to 10/9/2014 to submit revised plans showing drywells/runoff containment. |
NOI |
6:42 |
Joann Wilson, 27 Elliot Road. Proposed demolition of existing structure and construction of single-family dwelling, septic system modification and coastal bank restoration and mitigation plantings. |
NOI |
6:45 |
Mark A. and Patricia Thompson, 24 Waterline Drive North. Project in substantial compliance with Order of Conditions DEP File No. SE 43-2265. |
COC |
6:48 |
David G. and Virginia A. Hufnagel, 58 Monomoscoy Road West. Project in substantial compliance with Order of Conditions DEP File No. SE 43-2440. |
COC |
6:51 |
Lipnosky Investments LLC, 39 James Circle. Project in substantial compliance with Order of Conditions DEP File No. SE 43-2641 |
COC |
6:54 |
Michael Talbot: Presentation on Nitrogen Control Bylaw |