Conservation Commission Agenda 09/12/2013

Conservation Commission
Thursday, September 12, 2013
Ockway Meeting Room
Mashpee Town Hall

Call Meeting To Order:  5:55 p.m.

PRE/POST-HEARING AGENDA:  

  • Minutes:   Approve: June 13, June 27, and July 25, 2013 Minutes
HEARINGS

6:00
New Seabury Colony Villa Condominium Owners, 90 Shore Drive West.  Proposed seasonal platform and access stairs to beach. Continued from 8/22/2013 at request of engineer.  
NOI
6:03
Sandra P. Esposito, 25 Sand Dollar Lane.  Remove dead tree, prune two trees and install indigenous plantings.  Continued from 8/22/2013 at request of applicant.  
RDA
6:06
Jeffrey M. McInnes, 17 Waterway.  Pump, fill, abandon existing septic system and construct new upgraded septic system.
RDA
6:09
Catharine J. Brennan, 38 Fiddler Crab Lane.  Construct a retaining wall to assist a drainage swale and redirect storm water.
RDA
6:12
David H. and Donna R. Parsons, 229 Hooppole Road.  Completed seasonal pier in accordance with Order of Conditions and record plan.
COC
6:15
Lazar and Yelena Y. Koyfman, 79 Pond Circle.  Demolish existing deck and railing and replace with larger deck and railing.
RDA
6:18
Lois B. Tanzer, 69 Pickerel Cove Circle.  Remove dead trees and prune trees encroaching onto a dwelling.
RDA
6:21
Kenneth and Gloria J. Liatsos, Trustees, 118 Shore Drive West.  Proposed coastal bank stabilization and beach nourishment.
NOI
6:24
David and Glenys Pinchin, 124 Shore Drive West.  Proposed coastal bank stabilization and beach nourishment.  
NOI
6:27
Michael J. and Dawn M. Southwick, 126 Shore Drive West.  Proposed coastal bank stabilization and beach nourishment.  
NOI
6:30
Marceli DeOliviera, 106 Wheeler Road.  Demolition of existing dwelling and construction of new single-family home.    
NOI
6:33
Elen E. Murad, Trustee, 19 Keel Way.  SE 43-35: Order of Conditions superseded by SE 43-1332.  Request COC to close file.  SE 43-298: Project completed in compliance with Order of Conditions and record plan.  SE 43-355: Order of Conditions superseded by SE 43-1332 Request COC to close file.  SE 43-1332: Project completed in compliance with Order of Conditions and plan.  Numbers and street address are on the dock facility.  SE 43-1875: Project completed in compliance with Order of Conditions and record of plan and Amended Order of Conditions and record plan.  Landscaping completed per Conservation Commission request.  SE 43-2528: Project completed in compliance with Order of Conditions and record Plan.       
COC
6:36
John M. Newkirk, 113 James Circle.  SE 43-2369: Project substantially completed in compliance with Order of Conditions and record plan with the following deviation: Inkberry plantings were installed.

COC