Conservation Commission
Thursday, September 12, 2013
Ockway Meeting Room
Mashpee Town Hall
Call Meeting To Order: 5:55 p.m.
PRE/POST-HEARING AGENDA:
- Minutes: Approve: June 13, June 27, and July 25, 2013 Minutes
HEARINGS
6:00 |
New Seabury Colony Villa Condominium Owners, 90 Shore Drive West. Proposed seasonal platform and access stairs to beach. Continued from 8/22/2013 at request of engineer. |
NOI |
6:03 |
Sandra P. Esposito, 25 Sand Dollar Lane. Remove dead tree, prune two trees and install indigenous plantings. Continued from 8/22/2013 at request of applicant. |
RDA |
6:06 |
Jeffrey M. McInnes, 17 Waterway. Pump, fill, abandon existing septic system and construct new upgraded septic system. |
RDA |
6:09 |
Catharine J. Brennan, 38 Fiddler Crab Lane. Construct a retaining wall to assist a drainage swale and redirect storm water. |
RDA |
6:12 |
David H. and Donna R. Parsons, 229 Hooppole Road. Completed seasonal pier in accordance with Order of Conditions and record plan. |
COC |
6:15 |
Lazar and Yelena Y. Koyfman, 79 Pond Circle. Demolish existing deck and railing and replace with larger deck and railing. |
RDA |
6:18 |
Lois B. Tanzer, 69 Pickerel Cove Circle. Remove dead trees and prune trees encroaching onto a dwelling. |
RDA |
6:21 |
Kenneth and Gloria J. Liatsos, Trustees, 118 Shore Drive West. Proposed coastal bank stabilization and beach nourishment. |
NOI |
6:24 |
David and Glenys Pinchin, 124 Shore Drive West. Proposed coastal bank stabilization and beach nourishment. |
NOI |
6:27 |
Michael J. and Dawn M. Southwick, 126 Shore Drive West. Proposed coastal bank stabilization and beach nourishment. |
NOI |
6:30 |
Marceli DeOliviera, 106 Wheeler Road. Demolition of existing dwelling and construction of new single-family home. |
NOI |
6:33 |
Elen E. Murad, Trustee, 19 Keel Way. SE 43-35: Order of Conditions superseded by SE 43-1332. Request COC to close file. SE 43-298: Project completed in compliance with Order of Conditions and record plan. SE 43-355: Order of Conditions superseded by SE 43-1332 Request COC to close file. SE 43-1332: Project completed in compliance with Order of Conditions and plan. Numbers and street address are on the dock facility. SE 43-1875: Project completed in compliance with Order of Conditions and record of plan and Amended Order of Conditions and record plan. Landscaping completed per Conservation Commission request. SE 43-2528: Project completed in compliance with Order of Conditions and record Plan. |
COC |
6:36 |
John M. Newkirk, 113 James Circle. SE 43-2369: Project substantially completed in compliance with Order of Conditions and record plan with the following deviation: Inkberry plantings were installed.
|
COC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|  |