7:00 |
Mark Caliri (75 Edgewater Drive) 18’ x 21’ wooden platform and proposed vegetation plantings |
NOI |
7:03 |
Kevin Mulgrew (33 Sunset Circle) Construct wood retaining wall, fieldstone retaining wall and replace turf & patio area with sand and compensatory plantings **Continued to February 23, 2012 @ 7:03pm** |
NOI |
7:06 |
Lemonia Macropoulos (88 Cayuga Avenue) Remove five trees that are close to home that is damaging the deck and roof and are also potentially hazardous to the dwelling |
RDA |
7:09 |
Matt DeSutter (26 Waterway) Demolish and rebuild a single family home with driveway, pool and all appurtenant utilities |
NOI |
7:12 |
Rosemary & James Mitchell (90 Popponesset Island Road) Construct and maintain in perpetuity a licensed wooden pier ramp and float |
NOI |
7:15 |
Stephen Sullivan (7 Sextant Circle) Install a 3-bedroom soil absorption system to meet Title 5 requirements. The existing 1000 gallon leaching pit will be pumped dry, disconnected and filled with clean fill |
RDA |
7:18 |
John Donnellan (59 Pond Circle) Construct a 23’5” x 25’ two car attached garage with maintenance in perpetuity |
RDA |
7:21 |
Gloria Henn (29 Seconsett Point Road) Pump existing cesspool, fill with clean sand and abandon. A complete Title 5 septic system and associated piping will be installed |
RDA |
7:24 |
David Scarpitti/ Mass. Division of Fisheries and Wildlife (Great Hay Road / Holland Mills Road) Propose habitat management treatment activities which will include mowing and mulching of smaller trees and shrubs. Additional efforts may include prescribed burning and invasive plant species treatment at some point in the future. |
RDA |