Skip Navigation
This table is used for column layout.
 
Conservation Commission Agenda Nov. 16, 2008
Meeting is postponed to Thursday  Dec. 4th due to a lack of a quorum
CITY OF MARLBOROUGH
CONSERVATION COMMISSION
AGENDA

November 6,  2008 (Thursday)  7:00 PM
Marlborough City Hall, 3rd Floor, Memorial Hall

Public Hearings
7:00 P.M.       Notice of Intent (Continuation of Public Hearing)
177 Maple St. – 175 Maple St. L.L.C.
Proposes to redevelop the storage building associated with the former Dennison Manufacturing Building at 177 Maple St. near a small stream.  The construction will include the demolition and construction of a new retail building with associated parking and utilities.

7:10            Notice of Intent (Continuation of Public Hearing) – Draft Order
185-191 Mill St. – The Fay School’s Gary Reed
To redevelop the former Marlborough Equestrian Center into fields near wetland.

7:15            Notice of Intent
355 Boston Post Rd. - Kevin Labadini
Proposes to construct a car wash facility and associated parking and drainage near wetlands.

7:20            Notice of Intent
785 Boston Post Rd.  - PRTR, Inc.  c/o Waste Management of Mass., Inc. and Donald Wright
Proposes to correct an erosion problem at the stormwater outfall from the facility which drains into a wetland next to the eastern entrance of DiCenzo Blvd.

7:30            Notice of  Intent (Continuation of Public Hearing)
289 and 401 Elm St. - Cliff Schorer of Marlborough Elms, LLC
Proposes Marlborough Elms subdivision roadway work and drainage with the 100 ft. buffer zone and 200 ft. Riverfront Area to Bordering Vegetated Wetlands, abutting the north branch of Millham Brook.

Certificates of Compliance
·       DEP 212-93      60 Tassi Dr. (Lot 3) – Barbara Ann Estates - Partial
·       DEP 212-178     128 Prendiville Way, Re-issue – of full Certificate for Gristmill Estates III
·       DEP 212-1008    Mill St. – Equestrian Center entrance – Full
·       DEP 212-1024    735 Boston Post Rd. (connector road between Staples and Home Depot – Full

Extension Permits
·       DEP 212-971     Woodland Dr. and Vega Rd. – sewer service
·       DEP 212-824     Crane Meadow Corp. Center – 3 yr. extension

Draft Orders of Conditions
·       DEP 212-1057    37 Red Spring Rd.
·       DEP 212-1058    Maple St. water line

Discussion
·       Drawdown Ft. Meadow Reservoir – wall repairs around the lake
·       Forest Cutting Plan  - Parmenter Rd.
·       DEP 212-870   Forest Trail Estates / Mosher Ln. As-Built Plan – Desert Parking Area
·       DEP 212-870   Forest Trail Estates / Mosher Ln. As-Built Plan – Detention Basin Modifications
·       Project updates
o       Bridge St. bank repair
o       Target – Rte. 20 – Fafard site update
o       219 Forest St. – Fore Kicks II wetland violation – will be present (see letter)

Correspondence/Other Business
- MassHighway Rte. 20 (Lakeside Ave.) – follow-up e-mail – Oct. 30, 2008

Meetings – Next Conservation Commission meeting on November 20th and December 4th, 2008 (Thursday)

Adjournment.