Skip Navigation
This table is used for column layout.
 
Conservation Commission Agenda 09/01/2005
Page 1 of 2
CONSERVATION COMMISSION
78 Main Street, Hudson, MA 01749
(978) 568-9625



Martin Moran, Chairman  Paul Byrne, Vice-Chairman               Judith Sabourin, Clerk
David Esteves, Member           Misty-Anne Marold, Member               Joseph Rodrigues, Member  W. Minot Wood, Member

Tentative Agenda
September 1, 2005, 7:00 P.M.

1.0     Preliminaries
1.1.    Open Meeting
1.2.    Roll Call
1.3.    Additions or deletions to the agenda
1.4.    Agent Report

2.0     Hearings and Appointments 7:00 P.M.

2.1     Tony Marques, DPW Director to discuss Danforth Woods water survey

2.2     Continuance Notice of Intent  (DEP #190-455)
Request to Continue to 9/1/05
Applicant:  Empire Management Corp.
Location:  62 Coolidge Street
Project Description:  The project consists of the replacement of an Oil/Water Separator, the installation of 2,000 gallon underground industrial wastewater holding tank and the addition of two, car storage areas, to the existing automotive dealership.  The proposed car storage areas will add approximately 11,000 S.F. of impervious area to the site.

2.3     Request for Determination (HUD #313)
Applicant:  Todd Billings
Location:  33 Temple Ave.
Project Description:  Remove an existing timber retaining wall and construct a new boulder retaining wall within the existing wall footprint.  Some regarding of the area will take place and will direct runoff away from the lake.

2.4     Hillside Community – Informal review
2.5     Notice of Intent (DEP #190-457)
        Applicant/Owner:  Todd Marsh, Paramount Construction
        Location:  Coolidge Street Map 19 Parcels 214 & 215
Project Description:  Construction of a retail store, associated parking lot and retaining walls within the Buffer Zone of Bordering Vegetated Wetlands.        
Note:  The applicant has officially withdrawn the Notice of Intent (DEP # 190-0445).
WORK ASSOCIATED WITH THE BRIDGE OVER THE BORDERING VEGETATED WETLAND SHOULD BE DESCRIBED IN GREATER DETAIL TO DEMONSTRATE COMPLIANCE WITH PERFORMANCE STANDARDS PURSUANT TO 310 CMR 10.55. COMMISSION SHOULD EVALUATE WHETHER WORK IS PROPOSED WITHIN BORDERING LAND SUBJECT TO FLOODING (100 YEAR FLOODPLAIN) (310 CMR 10.57).
2.6     Request for Determination (HUD#312)
Applicant:  Construction Resources, Inc.
Location:  Lot # 9 Elaine Circle
Project Description:  Construction of a single family home, including access driveway, septic system, public utiiltes and site grading within the buffer zone of Bordering Vegetated Wetlands.


2.7     Notice of Intent (NO DEP # issued yet)
Applicant:  David J. Quinn
Project Description:  construction of a gravel access driveway from Old North road to the proposed building site of Lot #2, including work in the Buffer Zone and a “limited project” wetland crossing.

2.8     Abbreviated Notice of Resource Area Delineation (DEP #190-462)
Request for Continuance
Applicant:  Grace Baptist Church
Representative:  Beals Associates Inc., Cynthia O’Connell

3.0     Work Session
        3.1     Minutes
                3.1.1   August 18, 2005
        3.2     Vouchers
        3.3     Certificate of Compliance
4.0     Correspondence
5.0     Pending
        5.1     Enforcement Order River’s Edge Zina Farms (DEP 190-0440)
        5.2     Create an Order of Conditions inspection sign off card.
6.0     Advertisements and Conferences
6.1     Katrina Proctor to attend American Public Health Association Annual Meeting November 5 – 9th.
         (Out of Office Nov. 7- Nov. 11)
7.0     Commentary
8.0     Adjournment