HARBOR COMMITTEE MEETING 9/13/04
HARBOR COMMITTEE MEETING
SEPTEMBER 13, 2004

ATTENDANCE: GREG BISS, JOHN SULLIVAN, JOHN BISHOP, LEE HARRIS, BUD FINCH, ERIC VOISINE AND MELINDA KRESTEL.

MINUTES OF THE MEETING.

MEETING CALLED TO ORDER BY JOHN SULLIVAN AT 6:30 P.M.

MOTION TO APPROVE MINUTES FROM THE AUGUST 9, 2004 MEETING BY BUD FINCH.  SECONDED BY JOHN SULLIVAN. UNAM.

WORK AT THE BREAKWATER WILL START AS SOON AS CHARLIE IS BACK FROM BRINGING THE TUGBOAT BACK FROM MAINTENANCE.  HE WILL BE WORKING WITH RONNIE MORGAN TO FINISH UP DOWN THERE.  GILBERT MURPHY WILL COMPLETE THE ELECTRICAL ALSO.

REPAIRS TO SKID AND HOIST ARE ABOUT 90% FINISHED.  ERIC WILL COMPLETE THE REST OF THE WORK WHICH INCLUDES MORE BRACES AND PAINTING THE HOIST BASE.

THE ATTENUATORS WILL NOT GO IN THIS YEAR.  THEY NEED TO BE MOVED OFF DEAN’S PROPERTY ASAP.  JOHN BISHOP WILL TALK TO DEAN TO SEE ABOUT STORING THE FLOATS ON HIS PROPERTY AND HOW MUCH HE WOULD CHARGE INSTEAD OF MOVING THEM.

STILL WAITING TO HEAR FROM THE CORP OF ENGINEERS ABOUT THE APPLICATION FOR DREDGING.  IF THE OLD ONE HAS EXPIRED THEN WE WILL NEED TO APPLY FOR ANOTHER ONE.

NEW CURB STOPS FOR THE WATER SUPPLY TO THE INNER BASIN, THE NS AND BOAT RAMP WOULD COST ABOUT $300 ACCORDING TO INFORMATION THE ERIC HAS HEARD.  BUD SAYS HE WILL TALK TO RANDY FROM THE WATER COMPANY TO SEE IF THAT IS TRUE.

FLOAT REMOVAL WILL START AT THE END OF THE WEEK ON THE NORTH SIDE.  THE REST WILL BE TAKEN OUT AT THE END OF THIS MONTH WHEN ERIC IS BACK FROM 2 WEEKS OF COAST GUARD DUTY.  THEY WILL BE PUT OUT ON THE LOT ACROSS FROM THE BOAT SCHOOL AT SHACKFORD’S HEAD.

ADJOURNED AT 7:00 P. M. BY GREG BISS.  SECONDED BY CHARLIE LEPPIN.  UNAM.